FireCert Clock

Fire inspection templates

Pick the blank that matches the visit, print it, then put the same date on a list that sends mail.

Start from the job in front of you. A signed report, a monthly tag walk, a riser room book, and a next due date are different pieces of paper. The list below names each blank and the calculator that turns a finished date into the next one. Nothing asks you to sign in before the file downloads.

Which blank matches the visit

Columns are the templates. Rows are the job, the clock, and the file.

FeatureReport packAlarm reportLog bookExtinguisher checklistDue date calculator
UseOne visit that covers extinguishers, alarm, and sprinklersPanel, devices, and the monitoring test onlyA book the inspector can hold in the riser roomMonthly tag walk kept apart from the yearly serviceNext dates from a last date and an asset type
Frequency it recordsThe next due date you confirm on each system after the visitComponent intervals from the NFPA 72 schedule, confirmed by youThe dates you write. No single statutory gap is suppliedMonthly owner visual versus annual maintenance by a qualified personThe frequency table already used on the schedules. It does not adopt a code edition for your city
File typeWord, Letter PDF, and A4 PDF, plus a filled example and a field guideWord, Letter PDF, and A4 PDF for the alarm pack onlyPrintable log sections, with the same report files linked for the cabinetThe extinguisher blank from the report pack, in Word, Letter PDF, and A4 PDFNo file. The result stays on the calculator until you store the date
Open itFire inspection report templateFire alarm inspection reportFire safety log book templateFire extinguisher inspection checklistFire inspection due date calculator

Inspection report pack

The fire inspection report is the multi system pack. Portable extinguishers, fire alarm, and sprinklers each have a blank, a filled example, and a field guide. Word is for editing the header. Letter and A4 are for the truck. Use it when the visit covers more than one system and you want the same section order on every job.

Open the filled example when a new tech needs to see a completed row. The names in that file are sample data. Do not hand the example in as a finished visit. If the authority having jurisdiction names another form, use that form. The blanks say they are not official NFPA forms.

Alarm report

The fire alarm inspection report is the alarm slice of that pack, with the alarm files called out on their own. Use it when the visit is the panel, the devices, and the monitoring test, and you do not want to hunt through extinguisher files to find the alarm blank. The schedule that pairs with it is the alarm inspection schedule, not the extinguisher tag.

Record who was on site, which panel, which devices were exercised, what failed, who signed, and the next test date. A PDF that only says tested is a story, not a file you can audit later.

Log book

The smoke detector log sheet template is the device row sheet. The fire safety log book template is the bound book shape: cover, responsible person, asset classes, and lines for the visit. Use it when the marshal still expects a book in the riser room. The book does not email anyone. The account does, after you store the same assets and the same dates.

Print the book for the room. Keep the overdue list where you will see it before the walk, not during it.

Extinguisher checklist

The fire extinguisher inspection checklist is the monthly tag walk versus the annual contractor visit. The monthly line is the owner visual. The yearly line is maintenance by a qualified person. One shared line hides the date that costs money. The checklist reuses the extinguisher blank from the report pack, so you are not keeping two layouts for the same cylinder.

Hydrostatic dates and the six year internal job stay off the monthly line. Give them their own assets when you want those reminders.

Due date calculator

The fire inspection due date calculator takes a last inspection date and an asset type and returns the next dates from the frequency table already used on the schedules. It does not adopt a code edition for your city. Type the day the work finished, not the day you hope to book the next truck. A guessed last date produces a guessed next date.

Use the calculator before you promise a building a month. Use a template after the visit so the file matches the date you typed.

How to choose in one pass

  1. Need a sign off that covers extinguishers, alarm, and sprinklers: open the report pack.
  2. Need only the alarm files: open the alarm report.
  3. Need a book the inspector can hold: open the log book.
  4. Need the monthly tag versus the yearly service: open the extinguisher checklist.
  5. Need the next date from a last date: open the calculator.

You can download every file while logged out. Signup is for the mail: 30 days, 14 days, 7 days, 3 days, and the last day, on the assets you actually track. Free is one site and 25 assets at $0 a month, with mail to you and no card. Starter, Pro, and Business raise the limits. Read the current figures on pricing before you quote a client.

What the blanks do not do

They do not certify a system. They do not replace the form your authority having jurisdiction already requires. They do not pick NFPA 10, NFPA 25, NFPA 72, or a UK preset for you. Presets inside the product are a starting point. You set the interval when you add the asset.

They also do not dispatch a technician. The contractor still rolls the truck. The blank is the layout. The account is the date and the file after the truck leaves.

A small shop and a route

A shop with a handful of buildings can print the checklist and the log book the same afternoon and load one site before the next route day. A route with many buildings can import a CSV of sites, asset types, locations, and last service dates, then attach the finished PDF to the matching asset. You do not need every hydro date perfect on the first afternoon. You need the next visit visible.

When a vendor changes, keep the old PDFs on the visits. Import the new export. Do not trust punches the previous company never performed.

Interval guides

The blanks above are files. These three reads are the clocks that sit beside them.

The six-year extinguisher internal is the 2190 day NFPA 10 preset for stored-pressure units on a 12-year hydro cycle. It stays off the monthly tag.

The BS 5839-1 alarm service is the UK preset stored as 182 days. It stays off a 365 day NFPA 72 annual.

The kitchen hood cleaning frequency is the grease-duct date. There is no hood preset, so you type the gap the cleaner and the authority already use, apart from the suppression cylinder.

Portfolio and test clocks

Three more notes use dates you already have, or presets already stored in the product.

Fire risk review reminders are for a UK landlord or managing agent. You store the review date written on the assessment, or a date you choose. No statutory gap is supplied.

Hydrostatic test reminders use the NFPA 10 presets of 1825 days and 4380 days. The internal job at 2190 days stays on the six-year note above.

One inspection calendar is how a facilities team with several buildings keeps a single overdue list and a technician feed.

FAQ

Which file should I print first?

If you only have time for one, print the extinguisher checklist for the monthly walk or the report pack if a contractor visit is already booked.

Do I need an account to download?

No. Word and PDF links on each template open without a login. The account is for reminders after you decide the dates are worth mail.

Where do I put the next due date?

Use the calculator to see the next date, then store that date on the asset so the notices have somewhere to go.

Set up a site free

Set up a site free