The anniversary comes from the occupancy permit, the maintenance determination, or 13 June where regulation 223(2) applies. You confirm it.

The annual essential safety measures report (AESMR) is the yearly report an owner prepares for a Victorian building. An AESMR is the report regulation 223(1) of the Building Regulations 2018 (Vic) requires: the owner of a building or place of public entertainment must ensure it is prepared in accordance with regulation 224 within 28 days before each anniversary of the relevant anniversary date. The penalty stated in that regulation is 20 penalty units. Version 032 of the authorised text, read 17 Nov 2026, is https://content.legislation.vic.gov.au/sites/default/files/2026-10/18-38sra032-authorised.pdf and the in force instrument is https://www.legislation.vic.gov.au/in-force/statutory-rules/building-regulations-2018. The overview for essential safety measures and for essential safety measures melbourne is the Victorian hub.

Annual essential safety measures report

The annual essential safety measures report is the document regulation 223 and regulation 224 describe. It is not the occupancy permit and it is not the maintenance determination. Those documents can set the anniversary. The report is the yearly statement the owner signs. A maintenance determination that sets frequencies is explained on maintenance determination for essential safety measures in Victoria. The short name for that note is maintenance determination.

The anniversary date, in regulation 223(4), is the earlier of the date of issue of the first occupancy permit, or an amendment to an occupancy permit, that required an essential safety measure, and the date of the first maintenance determination that required one.

Regulation 223(2) is the other clock. For a building constructed before 1 July 1994, where a measure was required by the Building Act 1993, these regulations, or a previous corresponding Act or regulations, the report is prepared within 28 days before 13 June 2018 and each anniversary of that date. Regulation 223(3) turns that rule off for any measure that already needs a report under regulation 223(1).

How the proposal is counted

Type the anniversary you are actually on. If the occupancy permit that first required the measure was issued on 4 April 2019, type 4 April 2019, or the latest anniversary you want to count from. The preset adds 12 calendar months. 4 April 2019 proposes 4 April 2020. 29 February 2024 proposes 28 February 2025. You then confirm the upcoming anniversary, or type a different day if your records show one.

The proposal is the anniversary, not a date 12 months after an early report. If last year's report was signed on 20 March and the anniversary is 4 April, the next window is still the 28 days before 4 April. Put 4 April in the confirmed field if that is the date you want reminders to use. Until you confirm, the countdown stays off.

Buildings on the 13 June rule should use 13 June as the anchor, not the day a contractor happened to visit. You choose which of the two regulation 223 rules applies, and you set that date as the anchor.

Individual measures do not get a proposed date from this screen. Their frequencies sit on the occupancy permit, the maintenance determination, or a maintenance schedule. Add them as schedule lines.

The Victorian Building Authority's guide for owners is https://www.vba.vic.gov.au/consumers/guides/essential-safety-measures

The report form approved for regulation 224 is linked from https://www.vba.vic.gov.au/building/building-resource-hub/building-forms

FireCert Clock does not sign the report and does not lodge it. Presets are a guide. Confirm them with your municipal building surveyor or a qualified practitioner. The permit or determination on the building takes precedence.

Upload the anniversary record and we fill it in for you

If the occupancy permit or last report is already a PDF or a photo, upload it and review the suggested anniversary before you confirm it. The steps are on upload a Victorian ESM report.

The field list for owners is VIC ESM owner obligations. The permit and determination notes are VIC occupancy permit ESM list. The overview is Victorian essential safety measures.

The 28 day window, with the anniversary defined

Regulation 223 of the authorised Building Regulations 2018, read 9 Nov 2026, says the owner must ensure the annual essential safety measures report is prepared, in accordance with regulation 224, within 28 days before each anniversary of the relevant anniversary date. The anniversary date is the earlier of the first occupancy permit, or amendment, that required the measure, and the first maintenance determination that required it. For a building constructed before 1 July 1994 and covered only by subregulation (2), the window is the 28 days before 13 June 2018 and each later 13 June. Penalty stated there: 20 penalty units. Later versions of the regulations are in force. Confirm the current text on legislation.vic.gov.au before you rely on the unit count. https://content.legislation.vic.gov.au/sites/default/files/6c6863f2-b399-3ca2-9d3e-2fc9f014c810_18-038sra%20authorised.pdf

The commission guide, read 9 Nov 2026, says you may authorise an agent to complete the report and that it must be in the approved form. https://www.vba.vic.gov.au/consumers/guides/essential-safety-measures

A date example that is only arithmetic

Anniversary 19 April. The report for the year ending at that anniversary is prepared in the 28 days before 19 April, so from 22 March through 19 April in a non leap year, counting back 28 days. The product proposes the anniversary itself as the due date once you type it. It does not propose 22 March. If your program finishes the report on 22 March, confirm 19 April as the legal anniversary and keep 22 March in the notes as the day you prepared it, or confirm the day you actually use if your surveyor has told you to track the preparation day. Do not let the software pick. The 28 day count above is calendar arithmetic from the regulation's "within 28 days before", not a filing receipt.

13 June works the same way for a building that is only on regulation 223(2): the preparation window is the 28 days before 13 June, and the anniversary you store is 13 June.

How to track the report date

One confirmed date per building. Upload the last report on upload a VIC report and check the suggested anniversary against the permit. The pillar guide is Victorian essential safety measures. Owner signature and records are on owner obligations.

What does regulation 224 require in the report?

In the 2018 authorised text: the approved form, the owner's signature, the address, any inspection report details it names, a statement where AS 1851-2012 is being used under regulation 196 or 217 instead of the frequency on the permit or determination, and a statement that the owner took all reasonable steps to keep each measure operating and maintained. The product stores your dates. It does not generate that form.

Is the report the same as the maintenance record?

No. The guide says you also keep records of checks and repairs so they can be inspected. Regulation 225 in the 2018 text gives the municipal building surveyor or chief officer access within 24 hours, including reports for the previous 10 years.

FAQ

Is the report due on the anniversary or during the 28 days before it?

Regulation 223 says the report is prepared within 28 days before the anniversary. The preset marks the anniversary. You confirm the day reminders should use.

What if the last report was signed early?

Keep the legal anniversary as the anchor. An early signature does not move the next anniversary unless the permit or determination changed the date.

Does the product know public holidays?

No. The Victorian rule here is a calendar anniversary, not a count of business days.

Who signs the AESMR?

Regulation 224 of the Building Regulations 2018 says the annual essential safety measures report must be signed by the owner of the building or place. The same regulation says the report is in a form approved by the Authority and states the address of the building or place. Version 032 of the authorised text, read 17 Nov 2026, is https://content.legislation.vic.gov.au/sites/default/files/2026-10/18-38sra032-authorised.pdf