Six-year extinguisher internal maintenance
Stored-pressure units on a 12-year hydro cycle carry an internal job at 2190 days. That date is not the monthly visual and not the yearly maintenance.
A monthly initial proves someone looked at the cylinder. A yearly maintenance ticket proves a qualified person serviced it. Neither punch is the internal examination that sits between those walks and the long hydrostatic test. Fire protection shops lose that middle date because the hang tag has one row of year boxes and the route sheet has one line named "extinguisher." The internal belongs on its own asset, with its own last date and its own next date.
The product stores a preset labeled NFPA 10 six-year internal maintenance. The task text on that preset is internal maintenance for stored-pressure units on a 12-year hydro cycle. The interval stored on the preset is 2190 days. 2190 is six times the 365 day count used by the NFPA 10 annual maintenance preset. It is a day count inside the product, a starting point. Your authority having jurisdiction, and the edition that office adopted, can require a different gap. Change the number on the asset when they do. The product does not adopt a code edition for a city, and it does not certify a cylinder.
Which cylinders the preset is written for
Read the preset task before you apply it to every cabinet on a floor. It names stored-pressure units that follow a 12-year hydro cycle. A water unit, a wet chemical unit, a foam unit, or a carbon dioxide unit is on a different hydrostatic preset: NFPA 10 hydrostatic test, 5 year, stored as 1825 days. Stored-pressure dry chemical and halogenated agents use NFPA 10 hydrostatic test, 12 year, stored as 4380 days. 1825 is five times 365. 4380 is twelve times 365. Those hydrostatic presets are not the internal.
If the cylinder in front of you is not a stored-pressure unit on that 12-year cycle, do not borrow the 2190 day preset because the number six feels familiar. Match the agent on the label to the preset task, then edit the interval when the adopted edition or the manufacturer instruction says something else. A server-room clean agent and a kitchen wet chemical unit can share a building and still fail a copied interval.
The NFPA inspection frequency lookup lists the same family in words: a visual on a monthly rhythm, maintenance by a qualified person each year, internal work on a 6 year rhythm for stored pressure units that follow a 12 year hydro cycle, a 5 year hydrostatic interval for water, wet chemical, foam, and carbon dioxide, and a 12 year hydrostatic interval for stored pressure dry chemical and halogenated agents. Use that lookup when you are choosing a row. Use the asset when you need mail.
Day counts side by side
Options are the clocks. The numbers are the preset intervals already stored in the product.
| Detail | Six-year internal | Five-year hydrostatic | Twelve-year hydrostatic |
|---|---|---|---|
| Preset label | NFPA 10 six-year internal maintenance | NFPA 10 hydrostatic test, 5 year | NFPA 10 hydrostatic test, 12 year |
| Stored days | 2190 | 1825 | 4380 |
| Task the preset names | Internal maintenance for stored-pressure units on a 12-year hydro cycle | Hydrostatic test for water, wet chemical, foam and CO2 units | Hydrostatic test for stored-pressure dry chemical and halogenated agents |
| Relation to the yearly tag | Separate from the 365 day annual maintenance preset | Separate from the 365 day annual maintenance preset | Separate from the 365 day annual maintenance preset |
The monthly visual preset is still another clock: NFPA 10 monthly visual inspection, 30 days. The due-date footnote used for portable extinguishers says hydrostatic tests and six year internal maintenance are separate NFPA 10 presets and are not the monthly visual date or the annual maintenance date. The fire extinguisher inspection checklist is built around that monthly versus yearly pair. The fire inspection due date calculator returns that pair for a portable extinguisher. It does not fold the internal into those two dates. If you want a reminder for the internal, add an asset that uses the six-year preset.
Why one tag hides the internal
A hang tag is a small piece of card on a horn. The person who initials it each month is often a facilities lead, not the technician who breaks down a stored-pressure unit. The yearly maintenance crew may swap a valve or weigh an agent and punch the current year. The internal, years away, is a shop job with parts, a discharge, and a recharge. If all three events update one next-due field, the field shows whichever date was typed last. A fresh monthly initial then makes a late internal look current. A fresh internal makes the monthly walk look finished for a year.
Split the work the way the presets are already split.
Monthly visual. 30 day preset. Owner or site staff. Location, gauge, pin, seal, obstruction, and the initials.
Annual maintenance. 365 day preset. A qualified person. The service ticket, not the monthly initials.
Six-year internal. 2190 day preset. Stored-pressure units on a 12-year hydro cycle. The teardown record.
Hydrostatic test. 1825 or 4380 days, by agent. The test stamp or label, not the internal paperwork.
A vehicle-mounted unit and a corridor unit can share a site name and still need different hydro presets. Give the vehicle a location string that names the truck. A nickname such as "the red one" fails the next technician.
How the 2190 day count lands on a calendar
The preset adds days. It does not add six calendar anniversaries. Leap days inside the span move the result off the month-and-day you started with.
Counted example, using the stored 2190 day interval and not a building we inspected. Last internal recorded as 1 June 2020. Adding 2190 days lands on 31 May 2026. The span includes 29 February 2024, so the result is one day earlier than 1 June 2026. If you promise the customer "the same day in six years" without adding the days, you are one day off this particular span. Save the asset and read the next due the product stores. Do not retype an anniversary from memory.
Notices for a date of 31 May 2026 go out on 1 May, 17 May, 24 May, 28 May, and 30 May. Those are 30, 14, 7, 3, and 1 day before the stored date. The same ladder is what other assets use. The internal does not get a special ladder. It gets the ladder because it is an asset with a next date.
Anchor the last date on the day the internal was actually finished, not on the manufacture month, unless your program truly counts from manufacture and you have that date in writing. A guessed manufacture year produces a guessed next internal. If the cylinder was exchanged, the new cylinder starts its own internal clock. Do not leave the old cylinder's 2020 date on the new serial number.
What to store on the asset
Keep the fields a later reader can check without opening the cabinet.
Serial or tag ID. The metal, not a floor nickname.
Agent. Dry chemical, halogenated, or whatever the label says. The agent is why this preset was chosen instead of the 5 year hydrostatic preset.
Location. Building, floor, and a landmark. Two units in one lobby need two locations.
Last internal date. The day the work finished.
Next due. The date after 2190 days, or the date you edited because the authority required a different gap.
File. The shop report, a photo of the new collar or verification mark your program uses, and the name of the person who did the work.
Upload that file on the visit. On Starter and above, a service report can be read for dates and you confirm them. Confirming is the step. A wrong read that nobody checks becomes the next due. Free covers mail to you. Client contacts, when you want the building manager on the same notices, start on a paid plan. Current site caps and prices are on pricing.
After the shop returns the cylinder
Log the visit on the internal asset only. Leave the monthly asset alone unless someone also walked the tag that day. Leave the hydrostatic asset alone unless a hydro was part of the same shop order. Mixing the three logs makes the next audit look like one event.
If the cylinder failed and was replaced, close the old asset with a note and the removal date, and open a new asset for the replacement serial. Deleting the history removes the file an insurer may ask for later. Keeping a replaced serial on the live route makes the overdue list lie.
If the technician could not complete the internal because the cylinder was obstructed, missing, or already discharged, write that as the visit result and keep the due date where it is until the work exists. A note that says "see me" is not a result.
What this record is not
It is not a monthly checklist. Print the monthly blank from the templates hub when the walk is the tag. It is not the yearly maintenance contract. It is not a hydrostatic certificate. It is not a determination that NFPA 10, in the edition your city adopted, applies unchanged. Presets are a starting point. You remain responsible for the inspections.
It also does not dispatch the shop. The account stores the date, sends the notices, and holds the file. The truck still has to roll.
A route with many cabinets can import a CSV of sites, asset types, locations, and last service dates, then attach the internal PDF to the matching asset. You do not need every hydro stamp perfect on the first afternoon. You do need the 2190 day assets visible before the year they come due, because a six-year gap is long enough to forget which vendor did the last teardown.
Sign up and add the internal as its own asset on the site that already holds the monthly visual. The monthly walk can stay on the 30 day preset. The internal stays on 2190 days until you edit it.
Related guides
- Fire extinguisher inspection checklist for the monthly visual and the yearly maintenance that stay off the 2190 day asset.
- Fire inspection due date calculator for the monthly and yearly pair the calculator returns.
- Fire extinguisher tag tracking for the tag on the cabinet, which is not the internal examination record.
FAQ
Is the six-year internal the same preset as annual maintenance?
No. Annual maintenance by a qualified person is the NFPA 10 annual maintenance preset, stored as 365 days. The internal is the NFPA 10 six-year internal maintenance preset, stored as 2190 days, for stored-pressure units on a 12-year hydro cycle.
Do water and carbon dioxide units use 2190 days?
The six-year preset task names stored-pressure units on a 12-year hydro cycle. Water, wet chemical, foam, and carbon dioxide units are named on the 5 year hydrostatic preset of 1825 days. Match the agent before you pick the row, and follow the edition your authority adopted.
Does the due date calculator return the internal date?
The calculator returns the monthly and yearly pair for a portable extinguisher. Track the internal on its own asset if you want notices for the 2190 day interval.
What if the authority uses a different gap?
Edit the interval on the asset. The 2190 day figure is the stored preset, not a ruling for your city.