FireCert Clock

Fire dates for property managers

Strata, body corporate, facility, and managing agent work is a stack of buildings with different local clocks. Each building keeps its own confirmed date.

HSE teams with many sites keep one confirmed date per building.

A property manager usually finds out a fire filing is late from a committee, a tenant, or a council letter. The contractor did the visit. The date for the next filing lived in a spreadsheet that covered the whole portfolio with one column. That column cannot be right for every address, because the rule changes with the country, and often with the building.

FireCert Clock keeps one site per building. The overdue list reads across every site on the account. A jurisdiction preset proposes a date only where the published rule supports one number. You confirm it. Reminders use the confirmed date. The product does not lodge the form and it does not sign it.

Pick the local clock

Corporate health and safety teams who are not the managing agent start at HSE teams.

How a multi building week runs

Add the building, choose its jurisdiction, and upload the last statement, warrant, schedule, logbook, or certificate when you have one. Suggested fields stay unconfirmed until you accept them. If the read is unavailable, the file is still stored and you type the date. Then set the client contact if that plan includes client mail. The overdue list is the Monday view. Plan limits are on pricing. Nothing here changes those prices.

A Monday that starts with the committee, not the contractor

The contractor has usually already left the site. What is left is a chair who wants one pack: which building is late, which document is the proof, and who is speaking to the council or the fire authority. A property, strata, body corporate, or managing agent week is that pack, repeated across addresses that do not share a rule.

Keep one site per building. The overdue list is the cross building view. The activity log is what you show when a committee asks who confirmed a date. Client mail, where the plan includes it, goes to the building contact you store. FireCert Clock does not lodge a form, does not sign a statement, a warrant, or a certificate, and does not replace the accredited practitioner, independent qualified person, Professional Engineer, or competent person.

Where each building's rule actually lives

Read the country guide before you promise a date in a meeting. Each line below is the filing clock, not a substitute for the instrument.

  • New South Wales: the owner, or an agent the owners authorised, issues the Annual Fire Safety Statement each year. NSW Planning's fire safety certification page, read 9 Nov 2026, says an accredited practitioner (fire safety) assesses the measures and the exit systems, and that supplementary statements follow the fire safety schedule for critical measures. Guide: NSW Annual Fire Safety Statement. Upload: upload an NSW statement.
  • Victoria: the owner prepares the annual essential safety measures report. The Building and Plumbing Commission guide, read 9 Nov 2026, says the owner may authorise an agent to complete it, and that records are produced after 24 hours' notice. Guide: Victorian essential safety measures. Upload: upload a VIC report.
  • South Australia: PlanSA's Form 3 page, read 9 Nov 2026, says the owner gives annual maintenance verification to the council not later than 60 business days after the end of the calendar year, unless an exemption applies. Outside a council area the recipient is the State Planning Commission. Guide: essential safety provisions. Upload: upload an SA form.
  • New Zealand: MBIE's building warrant of fitness guidance says the owner, or the owner's agent, signs Form 12 on each anniversary of the compliance schedule and supplies it to the council with the Form 12A certificates. Guide: building warrant of fitness. Upload: upload a BWoF.
  • England: GOV.UK, read 9 Nov 2026, names the responsible person, who may be the managing agent, and requires a fire risk assessment that is reviewed regularly. There is no single renewal month on that page. Guide: England fire safety logbook. Upload: upload an England logbook.
  • Singapore: SCDF, read 9 Nov 2026, says a Fire Certificate is valid for 12 months unless otherwise stated, or 36 months when validity starts on or after 1 April 2026 unless otherwise stated, and that renewal is submitted at least two months before expiry. Guide: Singapore Fire Certificate. Upload: upload a Fire Certificate.
  • United Arab Emirates: there is no civil defence preset. Type the interval. UAE fire dates for facilities.

Corporate teams who are not the managing agent start at HSE teams.

Calculation: six buildings and one login

This is a calculation from the published plan table on pricing. It is not a discount and it does not change those prices.

Six addresses and one person who sends the committee pack. Six sites are inside the Starter site cap of 10 and outside the Free cap of 1. If each building stores about 30 dated lines, six times 30 is 180 assets, inside the Starter asset cap of 500 and far past the Free cap of 25. The Starter monthly price is $39. The yearly price is $390, which is $39 times 10. One seat matches Starter. Client email is in that column, so the building contact can receive the same reminder marks: 30 days, 14, 7, 3, and 1. Branded reports and the API are not in that column. Move to Pro at $79 a month when you need a second seat or more than 500 assets. Pro's seat cap is 5 and its site cap is 50.

Free document reads are 20 a month. Paid plans allow more. A file over 12 pages is stored and is not sent to the reader. You still type the date.

Mistakes that show up in the pack

One column labelled "fire renewal" for every country. A March AFSS and a June ESM anniversary are not the same day, and a South Australian Form 3 follows the calendar year rather than an anniversary. Mixing them makes the committee pack wrong even when every contractor visit happened.

Letting the practitioner's signature stand in for the owner. NSW Planning's October 2022 fire safety statement FAQ, read 9 Nov 2026, says the accredited practitioner must not make the owner's declaration. Victoria's authorised 2018 text of regulation 224 says the report is signed by the owner, while the commission guide allows an agent to complete it. Keep those roles apart in the file you store.

Does the overdue list replace the committee report?

No. Export the activity and the dates, and attach the statement, warrant, or certificate you already hold. The product does not write the chair's resolution.

Can client mail go out before a date is confirmed?

No. Reminders use the confirmed date. A suggestion from an upload stays unconfirmed until you accept it.

FAQ

Does one login mix New South Wales and England buildings?

Yes. Each site has its own jurisdiction. A change of jurisdiction is written to that site's activity log.

Will a preset file the form?

No. You confirm the date and follow the local lodgement steps.

Set up a site free

Set up a site free