FireCert Clock

BS 5839-1 fire alarm servicing

UK alarm servicing in the product is a 182 day preset. The US annual under NFPA 72 is a different asset at 365 days.

BS 5839-1 testing intervals are the gaps in that British Standard. The product stores a separate number, 182 days, on the preset labeled BS 5839-1 alarm servicing. That stored count is how reminders are spaced in the account. It is not a quotation of the standard's tables. A fire alarm panel in the UK and a fire alarm panel in the US do not share a clock just because both make noise. The product ships the UK preset labeled BS 5839-1 alarm servicing. The task on that preset is fire alarm servicing. The interval stored on it is 182 days. 182 is the same count as two NFPA 25 quarterly presets of 91 days. That arithmetic is how the day count is stored. It is not a statement that a sprinkler gauge and a panel are the same visit.

The NFPA 72 annual inspection and test preset is stored as 365 days. If a portfolio mixes a Manchester warehouse and a Texas warehouse, give each panel its own asset and its own preset. Copying the 365 day row onto a BS 5839-1 contract, or copying 182 days onto an NFPA 72 annual, will mail the wrong month. Your authority, the contract, and the edition in force can still demand a different gap. Edit the interval when they do. The product does not print a locked BS 5839 certificate, and it does not decide which standard a city enforces.

BS 5839-1 testing intervals

BS 5839-1 testing intervals live in the British Standard. The standard is published by BSI and is not reprinted here. The 182 day figure on the preset is the stored reminder gap for an asset you label as BS 5839-1 alarm servicing. 182 is the same count as two of the product's 91 day quarterly presets. That arithmetic is how the day count is stored. If the contract or the edition in force names a different gap, edit the interval. Do not treat 182 days as a row copied from the standard.

What 182 days is, and what it is not

182 days is the number on the BS 5839-1 alarm servicing preset. It is about half of the 365 day annual presets used elsewhere in the product (the NFPA 10 annual maintenance preset, the NFPA 72 annual preset, the NFPA 25 annual preset, the NFPA 101 annual preset, and the BS 5306-3 annual extinguisher service preset are each stored as 365 days). Half of 365 is 182.5, and the stored alarm figure is the whole number 182, matching two 91 day quarterly counts. Do not "correct" it to 183 to feel closer to a calendar half year unless the contract says 183. Save the preset, then change it only when you mean to.

The preset is not a weekly panel walk, not a monthly battery task, and not a device-by-device table. The US component rhythm for NFPA 72 lives on the fire alarm inspection schedule. Use that schedule when the adopted standard is NFPA 72. Use the 182 day preset when the asset is the BS 5839-1 service visit you already book.

The product also stores BS 5266 monthly and annual presets for emergency lighting, and a BS 5306-3 annual preset for extinguishers. A panel service does not complete a lighting flick test. Put lighting on the lighting presets if you track lights. Put cylinders on the extinguisher preset if you track cylinders. One site can hold all of them. One asset should not.

A counted example

Counted example, using the stored 182 day interval and not a panel we serviced. Last service 10 January 2026. Adding 182 days lands on 11 July 2026. January has a short remainder, 2026 is not a leap year, and the result is 11 July, not 10 July. If you tell the client "six months later" and you mean the same day of the month, you are describing a different rule from the preset. Read the next due after you save.

Notices aimed at 11 July 2026 leave on 11 June, 27 June, 4 July, 8 July, and 10 July. Those offsets are 30, 14, 7, 3, and 1 day before the stored date. They are the same offsets other assets use. A 182 day interval does not skip the short reminders. The short ones matter more on a half-year clock because the visit comes around before a yearly habit would notice.

If the engineer finished on a Friday and the certificate is dated the following Monday, store the date printed on the certificate you will show an auditor, and say so in the visit note. Two dates in one head produce two next dues. Pick the one the file shows.

Keep the US annual off this asset

A group that buys buildings in more than one country often imports a spreadsheet with a column called frequency and a single value of "annual." That import will mis-state a BS 5839-1 panel. Before the import, split rows.

BS 5839-1 service. Preset id in the product is the alarm servicing preset. 182 days. Certificate from the service visit.

NFPA 72 annual. 365 days. The licensed annual inspection and test, plus any shorter device tasks you choose to track as further assets. The NFPA 72 inspection checklist is the preparation list for that US annual, not for the UK service.

Shorter UK tasks you actually perform. If the contract names extra visits, add assets with the day count the contract names. Do not invent a day count to fill a blank. The 182 day preset is the one the product already has for BS 5839-1 servicing. Anything else is a number you type because a person agreed it.

Monitoring company tests, cause-and-effect checks, and loop changes can be files on the same visit or separate assets. If they happen on the service day, attach them to that visit. If they happen on another day, they need their own date or they will look done when only the panel was opened.

What to keep with the panel

The certificate you already issue stays the record. The account holds the date and the file beside it.

Site. The building, not the engineer's home office.

Panel identity. Make, model, and the location of the panel, so two panels in one plant do not share a due date.

Areas covered. Zone list or loop list as your certificate already states it. A partial visit should say which loops were in scope.

Service date on the certificate. The date you will defend.

Next due. 182 days on, unless you edited the interval.

Engineer and company. The name on the certificate.

Faults left open. A panel returned to service with a logged fault is not a silent pass. Write the fault where the next person will see it without scrolling a PDF for ten minutes.

Upload the PDF or a photo of the signed page. On Starter and above, uploaded reports can be read for dates and you confirm the read. Confirmation is required because a misread anniversary becomes the mail. Free sends mail to you. Adding the facilities contact on the building is a paid-plan feature. Read current limits on pricing before you quote the client a headcount.

Technicians can follow assigned work from a calendar feed. That feed shows the assets you assigned. It does not replace the certificate.

Paper in the panel room

Some occupiers still want a book by the panel even when you store PDFs. Print from the templates hub if a log book or an alarm report file helps the room. The blank is a layout. It does not set 182 days. The asset sets the days.

Do not hand a filled example in as a finished service. Sample names in example files are sample names. The certificate your engineer signed is the file that belongs on the visit.

If the occupier's insurer names a different form, use that form. The product is a due-date tracker. It is not an authority and it is not a certification body.

When the interval should change

Change the stored number when one of these is true.

The contract says a different spacing than 182 days. Type the contract number. Leave a note that names the contract, not a private theory.

The authority or the insurer writes a different spacing. The written instruction wins over the preset.

You discovered the last import used 365 because a column said annual. Fix the asset now. Waiting for the wrong notice teaches the client to ignore mail.

You added a second panel. Clone the location carefully and clear the last service date. A cloned date from the first panel will mark the second panel done.

Leave the number alone when the only pressure is that 182 feels uneven next to calendar months. Uneven is what a day count does. July does not match January. The notices follow the date you saved.

A small portfolio and a mixed one

A single UK site can live on the free plan if the asset count fits. One panel, a handful of lighting tests, and the extinguisher service may fit. A second building is the moment to read the plan limits rather than to squeeze two panels onto one site name. Squeezing makes the overdue list ambiguous: which panel is late?

A mixed US and UK portfolio should name the standard in the asset name. "Alarm, BS 5839-1" and "Alarm, NFPA 72 annual" survive a staff change. "Alarm" does not.

Sign up and add the panel with the BS 5839-1 preset if that is the service you sell. If the building is actually on an NFPA 72 annual, use the 365 day preset instead and keep the UK preset off that asset.

Related guides

FAQ

How many days is the BS 5839-1 preset?

The BS 5839-1 alarm servicing preset is stored as 182 days. That is the same count as two NFPA 25 quarterly presets of 91 days. Edit it when the contract or the authority requires a different gap.

Is 182 days the NFPA 72 annual?

No. The NFPA 72 annual inspection and test preset is stored as 365 days. Use a separate asset when a building is on that standard.

Does the product create a BS 5839 certificate?

No. You upload the certificate you already produce. The account stores that file next to the service date and the next due date.

Can lighting and the panel share one next date?

Only if one person owns both tasks and you accept a single next date. BS 5266 lighting presets are separate. A panel service does not complete a lighting test.

Track the alarm service

Set up a site free