Form 1 names the provisions. Form 2 is the installer's certificate. Form 3 is the annual proof to council. No business day count is guessed.

Essential safety provisions in South Australia are dealt with in regulation 94 of the Planning, Development and Infrastructure (General) Regulations 2017. The current authorised copy read for this preset is the consolidation published by the South Australian legislation site: https://www.legislation.sa.gov.au/__legislation/lz/c/r/planning%20development%20and%20infrastructure%20(general)%20regulations%202017/current/2017.24.auth.pdf

The pages of regulation 94 in that copy are marked 7 November 2025. Ministerial Building Standard MBS 002, Maintaining the performance of essential safety provisions, version dated May 2023, is the standard those regulations point at for forms and maintenance routines: https://plan.sa.gov.au/__data/assets/pdf_file/0006/1214187/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-3.pdf

PlanSA lists the forms: Form 1 schedule of essential safety provisions, Form 2 certificate of compliance with essential safety provisions, and Form 3 certificate of maintenance. https://plan.sa.gov.au/resources/forms

Older conversations still call the annual paper "Form 2". Under the current regulation and MBS 002, Form 2 is the certificate of compliance given when a provision is installed. The annual proof to council is Form 3. FireCert Clock follows that split. It does not sign either form, and it does not send them to a council. Presets are a guide. Confirm them with your council or a qualified practitioner. The schedule issued for the building takes precedence. This is not a government service.

What is dated, and what is not

Regulation 94(9) says the owner must not use, or permit the use of, a building that has a schedule of essential safety provisions unless maintenance and testing have been carried out on an annual basis, according to calendar years, so each provision keeps performing at least to the standard required when it was installed.

Regulation 94(10) and (11) say the owner must, not later than 60 business days after the end of each calendar year, give the council adequate proof for that calendar year. Outside a council area the proof goes to the Commission. The proof is a verification in the form the Chief Executive publishes on the SA planning portal. MBS 002 section 6.2 says that form is Form 3, ESP maintenance verification.

Sixty business days is not a fixed calendar date. Weekends and South Australian public holidays move it. The Form 3 row therefore proposes nothing. You type the confirmed date for the year you are in. The profile has a separate field for the day the proof was actually given to the council.

Regulation 94(12) says the annual proof duty does not apply to a Class 1b building, or to a Class 3, 4, 5, 6, 7, 8, or 9b building that does not rise more than 2 storeys and does not exceed 500 square metres, unless regulation 94(13) applies. Regulation 94(13) lets the council require the proof where the provisions were installed under a performance variation or the building has been the subject of a notice under section 157 of the Act. If you are unsure which limb applies, leave the confirmed date empty until the council or a building surveyor tells you.

Regulation 94(4) requires a schedule, Form 1 in MBS 002, when consent is issued, a classification changes with no building work, the owner applies and pays the fee, or other certification is issued. That schedule is not a yearly owner deadline, so the Form 1 row proposes no date. Each provision on it becomes a line. You set the frequency from column 3 of the schedule, not from a national template.

Form 2 is optional on the building until you are tracking an installation. Regulation 94(7) says the certificate of compliance is provided on completion of installation and signed by the installer. Regulation 94(8) says that where it goes to the council because no certificate of occupancy will be issued, it is provided within 20 business days after installation. That is an event deadline. No anniversary is proposed.

Regulation 94(14) states a maximum penalty of $10,000 and an expiation fee of $750 for a failure to comply with regulation 94(8), (9), (10), or (11). Regulation 94(15) says records of maintenance and testing for a period of up to the two preceding calendar years must be produced within 48 hours of an authorised officer's request. The maximum penalty stated there is $2,500 and the expiation fee is $500. Those are the regulation's figures, not an invoice.

Upload the last form and we fill it in for you

Upload Form 1, Form 2, Form 3, or a maintenance record as a PDF, photo, or Word file. FireCert Clock suggests the building, the provisions, and the dates printed on that file. You accept all suggestions or edit one field. Each suggestion names the file and the page. A confirmed date changes only when you accept that suggestion. Reminders start only on dates you confirm. The steps are on upload a South Australian ESP form.

Related South Australian notes

The annual proof window is SA Form 3 annual proof. The installation certificate is SA Form 2 compliance certificate. The schedule is SA ESP schedule and records.

Strata and facility managers can open SA ESP software for strata. Corporate teams can open SA fire dates for HSE teams.

FAQ

Is Form 2 the annual certificate?

Not in the current regulation and MBS 002 (May 2023). Form 2 is the installer's certificate of compliance. Form 3 is the annual maintenance verification to council.

Will the product count 60 business days?

No. You confirm the date. A guessed March date would be wrong in a year with extra public holidays.

Does every building file Form 3?

No. Regulation 94(12) exempts some buildings unless regulation 94(13) brings the duty back. Read those subregulations for the building in front of you.