Grease-duct cleaning is its own date. The product has no hood-cleaning preset, so you type the gap the cleaner and the authority already use.
A commercial kitchen collects two kinds of paper above the cook line. One is the suppression service ticket: cylinders, nozzles, links, and a tag. The other is the hood and grease-duct cleaning ticket: access panels opened, grease removed, and areas the cleaner could not reach. Kitchens fail later questions when both tickets live in one folder named "hood" and one spreadsheet cell named "kitchen." The person who asks, a fire marshal, an insurer, or a brand auditor, wants the date of the clean and the date of the suppression work as separate facts.
There is no hood-cleaning preset in the product. Interval presets that do exist cover extinguishers, fire alarm, sprinklers, and emergency lighting under named NFPA and BS labels. None of those labels is a grease-duct clean. You type the number of days the cleaning contractor and your authority having jurisdiction already use. The product will remind you from that number. A code interval for the hood appears only when you type it.
NFPA 17A and NFPA 96 inform many US kitchen programs. That is a pointer already used for kitchen suppression work, not a frequency table. Your authority and the cleaning contract win over a guessed default. If you do not know the gap, ask the cleaner and the authority before you type a number. A blank interval is safer than a confident fiction.
Why the clean is not the cylinder
Suppression hardware and exhaust cleaning drift apart for ordinary reasons. The suppression contractor may visit on a contract. The hood cleaner may visit on a different contract, with a different company, a different invoice, and a different definition of "done." A nozzle check does not prove the duct was scraped. A duct scrape does not prove the fusible links were replaced.
The kitchen suppression asset, described on the kitchen suppression inspection page, is the system: cylinders, nozzles, links, manual pull, gas shutoff, and the service tag. Keep that asset. Add a second asset for the clean. A late clean must not paint the cylinder green, and a fresh cylinder must not paint a dirty duct green.
If the same crew does both jobs on the same morning, you can still keep two assets that share a date for that one visit. The next cycle is allowed to diverge. Sharing one asset forever assumes the two contracts never split. They do.
Choosing a day count without inventing one
Start from paper you already have.
The last cleaning certificate. The recommended return date printed on it, if the cleaner printed one. Type the gap that recommendation implies, and keep the certificate on the visit so a reader sees the source.
The cleaning contract. A written spacing in the contract. Type that spacing. Name the contract in the asset note.
The authority or the insurer. A written spacing in their letter. That letter wins.
A twice-a-year habit you already run. Some accounts store a hood gap as 182 days so the clean is its own asset. 182 is a day count the product already uses for something else: the BS 5839-1 alarm servicing preset, which equals two NFPA 25 quarterly presets of 91 days. You may type 182 as a custom interval when you truly clean on that spacing. Typing 182 does not cite a hood standard. It only reuses a day count that already exists so the reminder math is the same math other assets use. If the cleaner says a different spacing, type theirs.
Do not copy an extinguisher monthly preset of 30 days onto a hood because the cabinet is in the same kitchen. Do not copy an annual 365 day extinguisher preset onto a hood because the suppression visit happens once a year. Those presets describe other tasks. The hood asset should say, in the name, that it is the clean.
High-volume fryers and a light cafe do not deserve the same assumption. The product will not detect the menu. You set the tighter or looser gap from the cleaner and the authority. Record why you chose it in the note, in a sentence a new manager can read.
What a useful clean record holds
The cleaner already has a form. Store that form. The asset is the index.
Hood identity. Which line, which floor, which tenant. A food court with four hoods needs four assets or a note that truly covers all four on every visit. A visit that cleaned two of four is not a pass for the other two.
Date finished. The day the crew left, not the day the work was booked.
Company and person. The name on the certificate.
Access. Which panels were opened. A clean that skipped a locked riser should say so.
Extent. Canopy, filters, and the duct run as far as the certificate claims. Do not widen the claim in your note past what the certificate says.
Leftovers. Grease left in place, access that was blocked, or a fan that was not isolated. A leftover is a result, not a footnote you hope nobody reads.
Photos. Before and after, if you take them, attached to the visit. A photo without a date in the visit is an orphan file.
Next date. The date you calculated from the interval you typed. Read it back after saving.
Upload the certificate. On Starter and above, a report can be read for dates and you confirm. A misread "next service" line is easy on cleaning certificates because they often print both the work date and a suggested return. Confirm which one you are saving as last service. Free covers mail to the account owner. The kitchen manager as a client contact is a paid-plan feature. Limits are listed on pricing.
Filters, fans, and the duct are not one sentence
People say "hood cleaning" and mean three different jobs.
Baffle or filter washes. Often done by kitchen staff on a short cycle, sometimes nightly in a busy line. If you want mail for that, it is a staff task with whatever spacing you actually run. Do not pretend a quarterly contractor certificate covers last night's filters.
Canopy and accessible plenum work. Usually the contractor, on the contract spacing.
Duct, fan, and discharge. The part inspectors care about when grease has traveled. The certificate should say how far the cleaner went. If it does not say, do not write "full duct" in the asset name.
You can track only the contractor certificate and leave nightly filter washes on a kitchen checklist that never enters the account. That is a reasonable split. Write it down so the next manager does not assume the account knows about filters. You can also track the contractor duct job and ignore the canopy if a different vendor owns the canopy. The overdue list is only as honest as the assets you created.
After the cleaner leaves
File the certificate on the hood asset the same day if you can. A certificate that sits in a cab for a month becomes a date nobody trusts. If the date on the PDF and the date the manager remembers disagree, the PDF wins, and the note can say the manager's memory differed.
If the crew was turned away because the line was still cooking, that is not a completed clean. Leave the due date where it is. A visit note of "no access" explains the overdue row. Marking the asset done because they "showed up" trains everyone to ignore the list.
If a tenant moved out and the hood was decommissioned, record the date and stop the asset. An empty stall should not keep mailing a cleaner.
Replacement of a fan or a duct section is a construction event. Attach the paperwork, and ask the cleaner whether the next interval restarts. Do not assume a new fan inherits the old duct's last clean date without asking.
How this sits next to other kitchen dates
Extinguisher cabinets in the same kitchen still use extinguisher presets: 30 days for the monthly visual, 365 days for annual maintenance, and the hydrostatic or six-year presets when those apply. Those dates are described on the six-year extinguisher internal maintenance page and the extinguisher checklist. They are not hood dates.
Alarm devices in the kitchen, if you track them, follow the alarm preset you chose, UK or US. A hood clean does not test a detector.
Suppression stays on its own asset, as the kitchen suppression page describes. When you only have time to enter one kitchen date this week, enter the one that is closer to overdue. Then enter the other before the next service, not after someone asks for both certificates at once.
Printable blanks for other systems live on the templates hub. A hood certificate from your cleaner is still the right file for the hood. Do not force a sprinkler blank to stand in for a grease-duct report.
A single restaurant and a multi-site operator
One restaurant can keep the hood asset and the suppression asset on a free site if the rest of the building fits the asset cap. The value is the two dates, not a pile of filter rows. Name them so a closer can tell them apart: "Hood clean, main line" and "Suppression, main line."
A multi-site operator should resist one asset called "all hoods." Brand auditors ask which store. The overdue list should answer with a store name. Import a CSV of sites and last clean dates when a previous cleaner already handed you a spreadsheet. Check a sample of rows against certificates before you trust the whole file. A spreadsheet cell that says "done" without a date is not a last service.
Sign up and add the hood as its own asset. Type the interval you can point to on a certificate, a contract, or an authority letter. If you are intentionally using the 182 day count because that is your twice-a-year practice, say that in the note so the next editor does not treat 182 as a hood code citation.
Related guides
- Kitchen suppression inspection for the cylinder, nozzles, and pull station that must not share the hood asset.
- Fire extinguisher inspection checklist for cabinets in the same kitchen that keep their own monthly and yearly dates.
- Annual fire inspection checklist for the building visit that still does not set the grease-duct interval.
FAQ
Does a preset set kitchen hood cleaning frequency?
No. Hood and grease-duct cleaning has no preset. You type the spacing your cleaner and your authority already use. Presets in the product cover other systems.
Can the suppression ticket cover the duct clean?
No. Keep a separate asset so a cylinder service cannot mark the clean done, and a clean cannot mark the cylinder done.
Is 182 days a hood rule?
182 days is the stored length of the BS 5839-1 alarm servicing preset, equal to two 91 day NFPA 25 quarterly presets. Some accounts type 182 for a hood they clean on that spacing. It is not a hood standard citation. Use your contract or authority letter when they name a different gap.
What should be uploaded?
The cleaner certificate for that hood, dated the day the work finished, with leftovers written where the next reader will see them.