VIC ESM software for strata
Owners corporations and facility managers in Victoria are preparing annual essential safety measures reports against anniversaries that are not the same day.
HSE teams with many sites keep one confirmed date per building.
The committee asks for the annual essential safety measures report in the same month for every building. Regulation 223 of the Building Regulations 2018 does not work that way. Where an occupancy permit or a maintenance determination required the measure, the report is prepared in the 28 days before the anniversary of the earlier of those instruments. A pre 1 July 1994 building covered only by regulation 223(2) uses 13 June. Mixing those anchors in one cell is how a compliant building looks late, and a late building looks fine.
FireCert Clock proposes the next anniversary of the date you type, and it leaves the occupancy permit and the maintenance determination without a proposed renewal. Measure frequencies come from those documents. The sources are on Victorian essential safety measures. The state guide is essential safety measures. The yearly file is the annual essential safety measures, also called aesmr victoria.
More than one owners corporation
Add a site per building. Upload the last report or the permit. You review suggested measures and dates. Accepting a suggestion does not sign the report. Regulation 224 still requires the owner's signature on the approved form. Records have to be available within 24 hours of a request under regulation 225. The file you store is your copy, not the handover.
Corporate teams watching the same addresses can open VIC fire dates for HSE teams. The index is property managers.
The owners corporation meeting wants the report, not the contractor's diary
A Victorian strata or facility manager is usually assembling the annual essential safety measures report before the anniversary, not after a reminder from the council. The Building and Plumbing Commission guide at the Victorian Building Authority address, read 9 Nov 2026, says the owner prepares that report and may authorise an agent such as a maintenance contractor to complete it. The authorised text of the Building Regulations 2018, S.R. No. 38/2018, regulation 224, says the report is signed by the owner. Keep both facts: the agent can prepare, the owner signs. Source guide: https://www.vba.vic.gov.au/consumers/guides/essential-safety-measures
The same authorised text, regulation 223, says the report is prepared within 28 days before each anniversary of the relevant anniversary date, where an occupancy permit or a maintenance determination required the measure. The anniversary date is the earlier of the first occupancy permit, or amendment, that required the measure, and the first maintenance determination that required it. For a pre 1 July 1994 building covered only by regulation 223(2), the window is the 28 days before 13 June and each anniversary of 13 June. Regulation 223 states a penalty of 20 penalty units. legislation.vic.gov.au lists later in force versions, including version 032 dated 27 Oct 2026. Quote a fine only after you read the current consolidation. The 2018 authorised PDF read on 9 Nov 2026 is https://content.legislation.vic.gov.au/sites/default/files/6c6863f2-b399-3ca2-9d3e-2fc9f014c810_18-038sra%20authorised.pdf
Regulation 225 in that text says annual reports for the previous 10 years, and the maintenance schedules, must be available at the building within 24 hours of a request by the municipal building surveyor or chief officer. Regulation 197 requires a current occupancy permit to be displayed for the classes it names, including Class 2 to 8 buildings constructed on or after 1 July 1994, and Class 9 buildings. The permit itself is not an annual renewal. Regulation 194 says the permit specifies the measures and the performance they must achieve.
What you take to the meeting
The occupancy permit or maintenance determination, the maintenance records, the draft report in the approved form, and the owner's signature. Frequencies come from those documents, not from a statewide table in this product. The long guide is Victorian essential safety measures. The anniversary note is annual report date. Owner duties are owner obligations. The permit list is occupancy permit. Upload on upload a VIC report. The surveyor's form is the maintenance determination.
FireCert Clock proposes the next anniversary from the date you type, then waits for you to confirm. It does not write the report, does not sign it, and does not send it to the municipal building surveyor.
Calculation: four buildings, one manager, one committee cycle
Four sites do not fit Free, which is 1 site and 25 assets. They fit Starter, which is 10 sites and 500 assets, at $39 a month or $390 a year. $390 is $39 times 10. One seat matches a manager who prepares the pack alone. Client email is on Starter, so each owners corporation contact can receive the same 30, 14, 7, 3, and 1 day marks. If each building has 40 measure lines, four times 40 is 160 assets, inside 500. The numbers are only the published table on pricing.
Mistakes that make the anniversary wrong
Using 13 June for a building whose occupancy permit already sets an anniversary under regulation 223(1). Asking the contractor to sign as owner. Treating the occupancy permit as something that expires every year. Filing the report and forgetting the 24 hour inspection set.
Owners corporation managers who also sit in a corporate team can read VIC fire dates for HSE teams.
Will the upload choose the anniversary?
Only if the date is written on the file. You still confirm it. A permit with no statewide renewal does not become a countdown by itself.
Does the product know the penalty unit dollar value?
No. Regulation 223 in the 2018 authorised text states 20 penalty units. The dollar value of a unit is set elsewhere and changes. Check the current dollar value with the authority that sets the penalty unit.
FAQ
Does every building use 13 June?
No. Use 13 June only where regulation 223(2) applies and regulation 223(1) does not.
Can the manager sign for the owner?
The VBA says an owner may authorise an agent to complete the report. Regulation 224 still says the report is signed by the owner. Read that guide before you treat a login as a signature.