FireCert Clock

Upload a South Australian Essential Safety Provisions Form

Upload Form 1, Form 2, or Form 3. The reader suggests what is printed. It does not count 60 business days for you.

Upload a South Australian essential safety provisions form, an installer certificate, or last year's maintenance verification. Drop in Form 1, Form 2, Form 3, or a test sheet that names a provision. PDF, photo, and Word all work. The reader can pick up the building, the address, the owner, the day the schedule was issued, the day Form 2 was completed, a date printed on Form 3, a council date, and each provision with its frequency and the person written next to it.

You review the boxes one by one. Keep them all, or correct a single provision and keep only that correction. Saved text is not overwritten by the keep-all button. Business days are not counted. When the form leaves the deadline blank, that box stays empty until you have counted 60 business days after the calendar year. Reminders use a day you confirm. Nothing here signs Form 2 or Form 3, and nothing is sent to a council.

Twenty reads a month are included before you pay. Higher plans include more. A file that is too big is refused. Too many pages means the file is kept as evidence and is not read.

How the three forms are told apart

Form 1 should list only the provisions installed in that building. Form 2 belongs with the installation, not with the yearly proof. Form 3 belongs with the yearly proof. Dates and labels are copied from the pages that show them. Form 2 is not renamed into the yearly council filing.

Where the rules are written

The organiser is South Australian essential safety provisions. The yearly window is SA Form 3 annual proof. The installation certificate is SA Form 2 compliance certificate.

Form 1, Form 2, Form 3, or the maintenance record

Upload the schedule of essential safety provisions, a Form 2 certificate of compliance, a Form 3 maintenance verification, or the maintenance record. The reader looks for the building, the address, the responsible person, the date the schedule was issued, the date Form 2 was provided, the Form 3 proof date, the date the proof was given to the council, and each provision with its frequency, last service, due date, person, and any defect on the page.

PlanSA, read 9 Nov 2026, says Form 3 is the approved annual proof under regulation 94(11), due not later than 60 business days after the calendar year unless an exemption applies. https://plan.sa.gov.au/resources/forms/Form_3_-_ESP_maintenance_certificate

The reader will not count those business days. MBS 002 says the count depends on the calendar, and a public holiday changes it. If a date is printed on the form, it can be suggested. You confirm it. Form 2 is not treated as next year's Form 3. Form 1 is not treated as an annual owner deadline.

Still unconfirmed

Accepting a suggestion does not send Form 3 to the council or to the State Planning Commission. It does not sign anything. A confirmed date you already stored is left alone by accept all. Reminders start after you confirm.

If nothing is read

Five files, 8 MB, 12 pages. Past the page cap, the file remains and the reader is skipped. Past 20 reads on Free, or 80 on Starter, 250 on Pro, or 800 on Business, the file remains and you type. The hourly ceiling is 8 reads. That is a product limit. It is not a new price. See pricing. The word for the reader is AI.

Use the essential safety provisions guide and the Form 3 date note before you confirm a March date you have not counted.

What if the form is the exempt small building case?

MBS 002 section 6.3, read 9 Nov 2026, describes buildings that do not submit Form 3 unless a notice or a performance variation applies. Do not accept a suggested annual proof date for a building you have checked is exempt. Store the file as the record of why you did not send one.

Can one upload hold Form 2 and Form 3?

Prefer separate files so the installation certificate is not saved as the annual proof. If they share a PDF, check every row before accept all.

FAQ

Does this lodge Form 3?

No. You still give the proof to the council, or to the Commission outside a council area. The product keeps the file and the dates you confirm.

Can the schedule be a photograph?

Yes. Send a PDF or a photo. You review what comes back. Unreadable pages stay stored, and you type the fields.

Track your ESP dates free

Set up a site free