NFPA 10 hydrostatic test reminders
Match the agent on the cylinder to the 1825 day preset or the 4380 day preset. A leap day moves the anniversary off a round year count.
A hydrostatic test is the pressure test of the cylinder shell, not the walk someone does with a clipboard and not the yearly maintenance a qualified person signs. Shops miss it because the date is stamped on the shell or written in a corner of the hang tag, and the route sheet only has a column for this year's punch. By the time the stamp is due, the technician who knew the agent type has changed routes. The reminder has to name the agent, the preset, and the next test date before the cylinder leaves the building for the test shop.
Two NFPA 10 presets cover that test. One is labeled NFPA 10 hydrostatic test, 5 year, and it stores 1825 days. The task on it names water, wet chemical, foam and CO2 units. The other is labeled NFPA 10 hydrostatic test, 12 year, and it stores 4380 days. The task on it names stored-pressure dry chemical and halogenated agents. Five copies of a 365 day year add to 1825. Twelve copies add to 4380. Both numbers are starting points saved in the product. The office that enforces the code, the edition that office adopted, and the cylinder maker can all require a different gap. Edit the interval when they do. Saving a preset does not choose the edition for a city, and it does not mean the shell passed.
There is no standpipe preset and no separate fire pump preset in the interval list. Pump churn and annual flow already have their own schedule. Sprinkler gauges, the main drain, and the five-year internal pipe assessment already have NFPA 25 presets at 91, 365, and 1825 days on the sprinkler schedule. This note is only the extinguisher shell test.
Pick the preset from the agent, not from the cabinet
Read the label before you click a preset. A water cylinder, a wet chemical cylinder, a foam cylinder, and a carbon dioxide cylinder take the 1825 day preset. A stored-pressure dry chemical cylinder and a halogenated or clean-agent cylinder take the 4380 day preset. The kitchen wet chemical unit and the server-room clean agent can hang in the same building and still need different clocks. Copying the kitchen date onto the server room, or the reverse, mails a test year that the shell stamp does not support.
If the unit in your hand does not match either task sentence, do not force it. Type a custom interval, a positive whole number up to 5000 days, which is the limit on the asset form. 1825 and 4380 both fit under that cap. A number you invent because the stamp is hard to read does not. Photograph the stamp, ask the test shop, then type the date they confirm.
The internal examination for stored-pressure units on a 12-year hydro cycle is a third clock. That preset is described on the six-year extinguisher maintenance note. Do not park the shell test on the internal asset. Passing an internal examination is not a pressure test of the shell, and a shell test does not erase the internal date that falls between hydrostatic tests on that 12-year family.
Monthly visuals and yearly maintenance stay on their own assets too. The extinguisher checklist is the monthly versus yearly pair. The due date calculator returns that pair for a portable extinguisher. It does not return the shell test. Add the hydrostatic asset when you want mail for the stamp.
A five-year count that includes a leap day
Counted example, using the stored 1825 day interval and not a cylinder we tested. Last hydrostatic date 15 January 2019 on a carbon dioxide unit. Adding 1825 days lands on 14 January 2024. The calendar anniversary would have been 15 January 2024. The earlier day happens because 29 February 2020 sits inside the span, and 1825 is exactly five times 365 with no extra day for the leap day. If you promise the customer "five years to the day" and you mean 15 January, you are describing a different rule from the preset. Save the preset, then read the next due the product shows.
Notices aimed at 14 January 2024 leave on 15 December 2023, 31 December 2023, 7 January 2024, 11 January 2024, and 13 January 2024. Those offsets are 30, 14, 7, 3, and 1 day before the stored test date. A long interval does not drop the short notes. The 30 day note is when you book the test shop. The day-before note is when you confirm the cylinder is actually off the wall.
A span with no 29 February lands on the anniversary. Do not "fix" a leap-shifted date back to the anniversary unless you have edited the interval on purpose. Write the stamp date you are using in the asset name so the next tech sees 15 January 2019 and not a nickname.
A twelve-year count with three leap days
Second counted example, again from the stored interval, not from a shop ticket. Last hydrostatic date 10 June 2014 on a stored-pressure dry chemical unit. Adding 4380 days lands on 7 June 2026. The anniversary would have been 10 June 2026. Three leap days sit in that span: 29 February 2016, 29 February 2020, and 29 February 2024. 4380 is twelve times 365, so each of those leap days pulls the result one day earlier than the anniversary. Three leap days, three days earlier, 7 June rather than 10 June.
Notices aimed at 7 June 2026 leave on 8 May 2026, 24 May 2026, 31 May 2026, 4 June 2026, and 6 June 2026. Book the hydrostatic shop from the May note. A twelve-year asset that only gets looked at during the yearly maintenance will be late by the time someone notices the stamp, because yearly maintenance uses the 365 day preset and never opens this asset.
If your adopted edition or the test shop states a different next test date, store that date. The preset is the start. The stamp and the adopted edition win when they disagree with 4380.
How a shop keeps the shell in the account while it is off the wall
When the test is booked, the cylinder leaves. The asset should stay. Location can say "at hydrostatic shop, tag H-14" so the route tech does not mark it missing in a way that deletes the history. When the shell comes back, upload the test report, set last service to the day the test shop finished, and let the next due recalculate from the interval you kept. If the shop condemned the shell, record that and retire the asset instead of rolling the date forward. A green next-due on a scrapped cylinder is worse than a blank cabinet, because the overdue list looks finished.
Do not reuse the yearly maintenance asset for this upload. The yearly file and the hydrostatic file answer different questions. An inspector who asks for the last shell test should open one asset and see one report. An inspector who asks for last year's maintenance should open the other.
Agent changes matter. If a wet chemical unit is replaced by a dry chemical unit, the 1825 day asset is the wrong clock for the new shell. Close it. Open an asset on the 4380 day preset with the new install date. Replacement is not a service of the old shell.
Where this sits next to other paper
The templates hub still has the extinguisher blank for the visit in front of you. That blank is a layout. The hydrostatic asset is the long date. Print the blank for the yearly walk. Keep the shell test in the account so the stamp year is not only metal.
NFPA 25 work is a different standard and a different set of presets. A 1825 day sprinkler internal and a 1825 day extinguisher shell test share a day count and share nothing else. Name the asset with the cylinder location, not with the number alone. "1825, riser" and "1825, CO2 by the boiler" must not look identical in an overdue list.
A route that tracks a monthly asset, a yearly asset, and a shell test for every cylinder will pass the free asset allowance quickly. Plan sizes, seat counts, and yearly prices are on pricing. Read them before you promise a customer a login for every technician.
When the stamp dates are worth mail, create a free account and add the first shell with the matching preset. You can attach a photo of the stamp the same day.
What the mail should cause
The 30 day note should produce a booking, not a shrug. Name the test shop in the asset location before that note arrives, so the person who reads the mail knows who to call. The day-before note should produce a check that the cylinder was removed or that the appointment still stands. After the report is uploaded, the next due moves. Until that upload, the asset stays due. Logging a conversation is not logging a test.
If several shells share a test year, give each its own asset anyway. A single asset named "all CO2" hides the one shell the shop rejected. The overdue list can show many rows in the same month. That is the point. You batch the shop run from the list. You do not collapse the list to make the month look smaller.
Related guides
- Fire extinguisher inspection checklist for the monthly and yearly walks that are not the shell test.
- Fire inspection due date calculator for the pair it returns, which leaves the hydrostatic date out.
- Fire extinguisher tag tracking for the hanging tag, which does not replace the stamp year in the account.
FAQ
Which cylinders use 1825 days?
Water, wet chemical, foam, and carbon dioxide, on the preset labeled NFPA 10 hydrostatic test, 5 year. Confirm the agent on the label before you save it.
Which agents follow the twelve year shell test?
Stored-pressure dry chemical and halogenated agents, on the preset labeled NFPA 10 hydrostatic test, 12 year. A clean-agent cylinder in that family uses this preset, not the five-year one.
Why can the next due fall before the anniversary?
1825 and 4380 count multiples of 365. Each 29 February inside the span makes the result a day earlier than the same month and day. Read the date the product stores after you save.
Is the six-year internal the same reminder?
No. Internal maintenance for stored-pressure units on a 12-year hydro cycle is its own preset. Keep the shell test on the hydrostatic asset.