Fire pump test schedule (NFPA 25)
Diesel no-flow churns are weekly. Electric churns are monthly except four weekly cases. The annual flow test is its own record.
Printable fire pump test log
Get an email before the next inspection is due. 1 site free, no card.
Frequencies in the table follow NFPA 25 (2023) sections 8.3.1 through 8.3.3, as summarized at ssifirepros.com/nfpa-25/nfpa-25-chapter-8, and the NFPA blog post of 9 Sep 2022 titled Weekly or Monthly No Flow Tests of Fire Pumps. Checked 2 Nov 2026. The adopted edition and local amendments govern.
| Detail | Diesel | Electric | Electric weekly cases |
|---|---|---|---|
| Churn frequency | Weekly no-flow (churn) test under 8.3.1.1.1, or an interval set by an approved risk analysis under 8.3.1.1.2 | Monthly is permitted under 8.3.1.2.2. Monthly is also allowed with a redundant pump under 8.3.1.2.3 | Weekly is required under 8.3.1.2.1 |
| Minimum run time | 30 minutes, from the NFPA blog of 9 Sep 2022 | 10 minutes, from the NFPA blog of 9 Sep 2022 | 10 minutes, from the NFPA blog of 9 Sep 2022 |
| Annual flow points | Qualified personnel under 8.3.3. Constant speed: churn, 100 percent, and 150 percent of rated flow (8.3.3.1). Variable speed: churn, 25, 50, 75, 100, 125, and 150 percent under variable speed control (8.3.3.2), plus churn, 100 percent, and 150 percent at constant speed (8.3.3.3). If the supply cannot flow 150 percent, test at 100 percent and the maximum allowed flow (8.3.3.4) | Same annual points as the diesel column. The driver type does not change section 8.3.3 | Same annual points as the diesel column. The weekly churn cases do not replace the annual flow test |
| Section reference | 8.3.1.1.1 and 8.3.1.1.2 for churn. 8.3.3 for the annual flow test | 8.3.1.2.2 and 8.3.1.2.3 for churn. 8.3.3 for the annual flow test | 8.3.1.2.1 for churn. 8.3.3 for the annual flow test |
Diesel no-flow test
A diesel fire pump gets a no-flow test, also called a churn test, every week. That is section 8.3.1.1.1. The alternative in 8.3.1.1.2 is an interval set by an approved risk analysis. It is not a guess that a monthly run feels close enough. If no approved analysis is on file, the weekly rule is the one the 2023 text states.
The NFPA blog of 9 Sep 2022 gives a minimum run of 30 minutes for that diesel no-flow test. Write the actual minutes in the log. A start and a stop that nobody timed is not a 30 minute run.
Driver type on the churn row should say diesel. A later reader should not have to open the controller door to learn which rule applied.
Electric monthly permission
An electric fire pump is permitted to use a monthly no-flow test under 8.3.1.2.2. Monthly is also allowed when a redundant pump is present, under 8.3.1.2.3. The NFPA blog of 9 Sep 2022 gives a minimum run of 10 minutes for the electric no-flow test.
Monthly is a permission, not a soft suggestion that sometimes becomes weekly. If none of the four weekly cases apply, and you are not relying on a different adopted edition, the 2023 text permits monthly. Record driver type as electric so the row is not read as a diesel weekly.
Four cases that keep an electric pump on a weekly churn
Section 8.3.1.2.1 requires a weekly no-flow test for an electric pump in four situations. One match is enough. You do not need all four.
Buildings beyond fire department pumping capacity. The pump serves a building the fire department cannot supply with its own pumpers. The weekly electric churn is the rule for that building, not the monthly permission.
Limited-service controllers. The controller is a limited-service controller. Name the controller on the pump asset so the weekly case is visible without a second visit to the pump room.
Vertical turbine pumps. The pump is a vertical turbine. Driver type alone is not enough. Write vertical turbine in the notes or in the pump ID description so the weekly case is obvious on the log.
Suction from ground-level tanks or a source without useful pressure. Suction comes from ground-level tanks, or from a source that does not provide useful pressure. A city main with useful pressure is a different suction story. Do not mark this case because the tank happens to sit somewhere on the site. Mark it when suction is actually taken from that tank or from a source without useful pressure.
The minimum run cited by the 9 Sep 2022 blog for these electric weekly runs is still 10 minutes. Weekly changes the calendar. It does not change that blog figure to the diesel 30 minute figure.
Annual flow test
Section 8.3.3 is the annual flow test. Qualified personnel run it. A weekly or monthly churn does not stand in for it. A churn measures a no-flow condition. The annual test moves water.
Constant speed pumps test at three points under 8.3.3.1: churn, 100 percent of rated flow, and 150 percent of rated flow.
Variable speed pumps have two sets of points. Under variable speed control, 8.3.3.2 uses churn, 25 percent, 50 percent, 75 percent, 100 percent, 125 percent, and 150 percent. At constant speed, 8.3.3.3 uses churn, 100 percent, and 150 percent. Both sets belong on the record when the pump is variable speed. One set does not erase the other.
If the water supply cannot flow 150 percent, section 8.3.3.4 says the test runs at 100 percent and at the maximum flow the supply allows. Write that maximum on the test points line. Do not leave the 150 percent cell blank and hope a reader infers the reason.
Rated gpm belongs on the annual record so each test point has a denominator. Net pressure and rpm belong on the same row as the pass or fail mark and the contractor name. The printable annual table is built for those fields: rated gpm, test points (churn, 100, 150), net pressure, rpm, pass or fail, and contractor. Add the extra variable speed points in the test points cell when 8.3.3.2 applies. The column is wide enough for 25, 50, 75, 125 as well as churn, 100, and 150.
How to fill the churn log
The printable file is a blank. It is not a filled example and it is not an official form. Word is there when you need to edit the header. Letter and A4 are there when the pump room still wants paper. No login.
Each churn row has nine fields.
Date. The day the pump actually ran, not the day someone meant to run it.
Pump ID. The tag on the controller or the asset name you already use. Two pumps in one room need two IDs. A nickname like "the big one" fails the next tech.
Driver type. Diesel or electric. If an electric pump is in a weekly case, add the case in the alarms and trouble cell or beside the driver type so the weekly calendar has a reason.
Run minutes. Compare them with the blog minimum you are using: 30 for diesel, 10 for electric. Shorter than that minimum is a result you write down, not a result you round up.
Suction psi. The suction gauge at the conditions of the run.
Discharge psi. The discharge gauge on the same run. A single number with no label is not both gauges.
Packing drip OK. Yes or no. A no needs a note. Do not leave the cell empty and call it fine.
Alarms and trouble. Anything the controller showed: fail to start, overspeed, low oil, a phase alarm, a transfer that did not return. "OK" is allowed when you looked. A blank is not a look.
Initials. The person who stood at the pump. Initials without a date on the same row do not identify the run.
Keep weekly and monthly rows in this log. Do not squeeze the annual flow points into a churn row. The second table on the sheet is the annual flow test record.
Two dates, two reminders
A churn and an annual flow test answer different questions. One next due date hides the shorter run behind the yearly test, or hides the yearly test behind a string of weekly greens. Store them as two assets when you want two sets of mail. The product stores the interval you enter. It does not choose edition 2023 for your city, and it does not sign the annual test. Qualified personnel still perform section 8.3.3.
Upload the finished log or the contractor packet on the matching asset. The site PDF lists last service, next due, and the file. That is the packet to hand over when someone asks what ran, without a search through old email.
Free covers one site. Paid plans raise site and asset limits and add client mail. Read the current figures on pricing before you quote a client. The fire inspection due date calculator is the arithmetic for intervals you already store. It does not replace the section numbers in the table above.
Risk analysis and redundant pumps
Section 8.3.1.1.2 is the diesel path for a non weekly interval, and only through an approved risk analysis. Keep a copy of that analysis with the pump file if you rely on it. The churn log still needs dates, minutes, gauges, packing, alarms, and initials at whatever interval the analysis set.
Section 8.3.1.2.3 is the electric path that allows monthly when a redundant pump exists. Name the redundant pump. A spare controller in a crate is not the pump named in that section. If the redundant unit is out of service, look again at 8.3.1.2.1 and 8.3.1.2.2 before you keep the monthly stamp.
What the sheet is for on the day of the annual
Bring the churn log to the flow test. Qualified personnel can see whether the weekly or monthly runs happened, and whether packing or alarms were already a problem. The annual table then records rated gpm, the test points, net pressure, rpm, pass or fail, and the contractor. Pass or fail is the contractor's mark. The register does not convert a file upload into a certification.
If the supply stopped the test at the maximum allowed flow under 8.3.3.4, the contractor line should say so in words, and the test points cell should show 100 percent plus that maximum. A pass mark with no flow points is not the record 8.3.3 describes.
Several pumps and a jockey
Each fire pump gets its own ID and its own pair of dates when the drivers or the weekly cases differ. An electric pump on a monthly permission and a diesel pump on a weekly churn cannot share one row without losing a rule. A vertical turbine on the same header as a horizontal electric pump is the same problem.
A jockey pump is not the fire pump in section 8.3. Give it a separate asset if you exercise it on a different day. A green fire pump row does not show that the jockey cycled.
Paper in the pump room and a file you can find
Print the Letter or A4 blank, or edit the Word file and print that. Leave the sheet where the churn happens, then file a copy on the asset after the run. Inspectors sometimes ask for more than the latest tag. Attached logs answer with dates and gauge numbers instead of a memory of who was on shift.
The sprinkler inspection schedule is the valve, drain, and internal work calendar. It is a different record from the churn and flow sheet. The annual fire inspection checklist is the walk across asset classes. The fire safety log book template is the bound book. Use those for their jobs. Use the pump log for the nine churn fields and the annual flow fields.
After the contractor leaves
Confirm the annual date you want the next reminder to use. A flow test in March is not automatically a churn date. The next churn still follows weekly or monthly, whichever column you are in. The next annual follows section 8.3.3 a year later when you are applying the 2023 text as checked on 2 Nov 2026.
Seasonal rooms and fuel
Some owners track fuel level or room condition on a second asset so it does not disappear between churns. That second asset is a local task you chose. It is not an extra NFPA 25 frequency from the sections above. Do not invent a code interval for it. Set the interval you actually enforce, and keep the churn log on the pump itself.
Cold weather does not erase 8.3.1.1.1. If an approved risk analysis or the adopted edition changes the winter interval, file that decision with the pump and set the asset to match. Until that paper exists, the diesel column stays weekly and the electric column stays on the monthly permission or the weekly cases.
Reading the table without a code book in your hand
Start with driver type. Diesel goes to the first column: weekly churn under 8.3.1.1.1, 30 minute minimum run from the 9 Sep 2022 blog, annual points under 8.3.3. Electric goes to the second column unless one of the four 8.3.1.2.1 cases applies. Those four cases move you to the third column: weekly churn, 10 minute minimum run from the same blog, and the same annual points. Redundant pump monthly permission stays in the electric column under 8.3.1.2.3. An approved risk analysis is the diesel exception under 8.3.1.1.2, not a blanket excuse for every electric pump.
Then read the annual row across. It does not get shorter because the churn was faithful. Constant speed, variable speed, and a supply that cannot make 150 percent are the three shapes of 8.3.3.1 through 8.3.3.4. Write the shape you tested. Store the file. Set the next churn and the next annual as separate dates when both matter.
The printable log is the place those numbers live between visits. Track due dates free when you want mail before the next one, with one site at no charge.
FAQ
How often do you test a diesel fire pump?
NFPA 25 (2023) section 8.3.1.1.1 calls for a weekly no-flow churn test. Section 8.3.1.1.2 allows a different interval when an approved risk analysis sets it. The NFPA blog of 9 Sep 2022 gives a minimum run of 30 minutes. The annual flow test under 8.3.3 is additional and is run by qualified personnel.
Is a fire pump churn test weekly or monthly?
Diesel no-flow tests are weekly under 8.3.1.1.1 unless an approved risk analysis sets another interval under 8.3.1.1.2. Electric pumps are permitted monthly under 8.3.1.2.2, and monthly is also allowed with a redundant pump under 8.3.1.2.3. Weekly is required for electric pumps in the four cases in 8.3.1.2.1: pumps serving buildings beyond fire department pumping capacity, limited-service controllers, vertical turbine pumps, and suction from ground-level tanks or a source without useful pressure. The blog of 9 Sep 2022 gives 30 minutes for diesel and 10 minutes for electric.
What is the annual fire pump flow test?
Section 8.3.3 is the annual flow test by qualified personnel. Constant speed pumps test at churn, 100 percent, and 150 percent of rated flow under 8.3.3.1. Variable speed pumps test at churn, 25, 50, 75, 100, 125, and 150 percent under variable speed control (8.3.3.2) and at churn, 100 percent, and 150 percent at constant speed (8.3.3.3). If the supply cannot flow 150 percent, the test runs at 100 percent and the maximum allowed flow under 8.3.3.4.