Fire inspection due date calculator

Enter the asset and the last inspection date. See the next visual due and the next test due. Then get an email before that date.

Next due dates

Confirm with your AHJ. Dates follow the frequency table used on the schedule and checklist. They are not a code determination.

Email me before that date. 1 site free.

A finished inspection is only useful if the next date is already on a list. The form above takes the asset type and the last inspection date and returns two dates: the next visual due and the next test due. It uses the intervals already published for scheduling. It does not read your panel, it does not file with the fire marshal, and it does not decide which edition your city adopted.

You can run it with no account. The button under the result is there when you want an email before that date. Free is $0 a month for 1 site and 25 assets, with mail to you and no card.

Where the intervals come from

Fire alarm rows follow NFPA 72 (2022) Table 14.3.1 for visual inspection and Table 14.4.3.2 for functional tests. That summary is the same one printed on the annual fire alarm inspection schedule and the NFPA 72 inspection checklist. Source: Building Fire Alarm Association of Maryland, NFPA 72 Chapter 14 training notes, checked 30 Oct 2026, https://www.bfaam.org/_files/ugd/3c5721_0e779a2fd01b4e079d8c8b5e5f429f4d.pdf.

Extinguishers use the NFPA 10 presets: monthly visual and annual maintenance. Sprinkler gauges use the NFPA 25 quarterly preset for the visual and the NFPA 25 annual preset for the system test date. Exit lights use the NFPA 101 monthly preset and the NFPA 101 annual preset. Those presets are the same ones you can load onto an asset after you sign up.

How a word in the table becomes a date

The tables say weekly, monthly, quarterly, semiannual, or annual. They do not print a day count. The calculator uses the day counts already stored on the presets.

Monthly is 30 days, from the NFPA 10 monthly visual preset and the NFPA 101 monthly preset.

Quarterly is 91 days, from the NFPA 25 quarterly preset.

Semiannual is 182 days, two times that 91 day quarterly count. Table 14.3.1 uses the word semiannual for several visual rows, including initiating devices and notification appliances.

Annual is 365 days, from the NFPA 72 annual inspection and test preset. The NFPA 10 annual maintenance preset and the NFPA 101 annual preset use the same 365 day count.

Weekly is 7 days, for the unmonitored control unit visual in Table 14.3.1 item 2(2).

If your authority having jurisdiction names a shorter interval, use theirs. The line under the result says to confirm with your AHJ for that reason. A jurisdiction note you type is repeated with the result. It does not change the math.

What each asset returns

Portable extinguisher. Next visual due is 30 days after the last inspection. Next test due is 365 days, the annual maintenance. Hydrostatic tests and the six year internal maintenance are separate NFPA 10 presets. They are not these two dates. Read them off the tag and track them as their own assets when you need those reminders.

Smoke detector. Next visual due is 182 days, Table 14.3.1 item 17, initiating devices. Next test due is 365 days, Table 14.4.3.2 item 17(2), functional test with smoke entry. Sensitivity testing is Table 14.4.3.2 item 17(3). That row says within 1 year of install, then every other year, and up to 5 years when the detector stays inside its marked range. The calculator does not collapse that rule into one date.

Control unit, monitored. The sooner visual is the semiannual trouble signal check, Table 14.3.1 item 2(1)(e), 182 days. Fuses, interfaced equipment, lamps and LEDs, and primary power are annual under item 2(1)(a) to (d). The test date is the annual functional test, Table 14.4.3.2 item 2(1), 365 days. Showing the sooner visual keeps the trouble signal row from hiding behind the annual.

Control unit, unmonitored. The visual is weekly, Table 14.3.1 item 2(2), 7 days. The functional test is still the annual row, 365 days. A weekly walk does not prove the annual happened. Split them if two people own the two jobs.

Sprinkler gauge. The visual is the NFPA 25 quarterly preset, 91 days, which covers gauges, waterflow devices, and fire department connections. The test date is the NFPA 25 annual preset, 365 days, which covers annual sprinkler, main drain, and antifreeze tasks. The gauge inspection itself is the quarterly visual. Confirm which task your AHJ applies to that gauge. The sprinkler inspection schedule describes the longer stack, including five year internal work that this pair of dates does not cover.

Exit light. The shorter date is the NFPA 101 monthly functional test of at least 30 seconds, 30 days. It is shown as the next visual due because it is the inspection you repeat most often. The next test due is the NFPA 101 annual full test of at least 90 minutes on battery, 365 days. Keep the columns apart so twelve monthly passes cannot hide a missed duration test.

Manual pull station. Visual follows Table 14.3.1 item 17, semiannual, 182 days, because manual boxes sit with the other initiating devices on that row. The functional test is Table 14.4.3.2 item 17(1), annual, 365 days.

Notification appliance. Visual is Table 14.3.1 item 22, semiannual, 182 days, covering horns, speakers, and strobes. The functional test for audible appliances is Table 14.4.3.2 item 22(1), annual, 365 days. Visual appliances in item 22(3) are also annual.

Waterflow device. Both the visual, Table 14.3.1 item 18(2), and the functional test, Table 14.4.3.2 item 18(2), are semiannual. Both dates land 182 days out. The footnotes name the two rows so you can see they are not the same task. A quarterly gauge check is a different asset.

What to do with the dates

Write both dates on the report before it goes in the cabinet. The fire inspection report template has Word and PDF packs for extinguishers, fire alarm, and sprinklers. Upload the finished PDF on the matching asset.

If you want the inbox to chase the date, add the asset on a free site. The button under the result starts that. You still see the dates with no account.

Log a visit only when the work passes, since logging moves the next due date. A failed visit should stay overdue until someone repairs it and logs a pass.

Store the contractor PDF and the owner sheet on separate assets when the intervals differ. One asset with one next due date will hide the shorter walk. The calculator is the way to see that split before you type the asset in.

What the calculator will not do

It will not pick your adopted edition. It will not sign the report. It will not treat a monthly light test as the annual duration test. It will not turn a semiannual visual into proof of the annual smoke entry test. If the footer of the contractor PDF disagrees with the date you typed, believe the signed report, then correct the asset before reminders send.

A local amendment appears only when you type it. Some cities still enforce an older NFPA 72 edition, or they add a paper log rule the table does not mention. The California State Fire Marshal and the FDNY publish their own filing paths, and those notes live on the fire alarm inspection report page. Use that page when the form, not the interval, is the question.

A worked example you can check

Take a smoke detector last inspected on 15 Jan 2026. The visual interval is 182 days, so the next visual due is that date plus 182 days. The smoke entry test interval is 365 days, so the next test due is 15 Jan 2027. An extinguisher inspected the same day is due for the next monthly visual on 14 Feb 2026 and for annual maintenance on 15 Jan 2027. An exit light tested the same day is due for the next monthly functional test on 14 Feb 2026 and for the annual duration test on 15 Jan 2027. If your result differs, the last date or the asset type is not the one you think you entered.

Shell tests use their own presets. Five-year and twelve-year hydrostatic reminders are NFPA 10 hydrostatic test reminders. The internal examination between those tests is six-year extinguisher maintenance.

FAQ

Do I need an account to see the dates?

No. Enter the asset and the last inspection date. The two due dates show before any signup. The email before that date is the free site.

Why can the visual date and the test date differ?

NFPA 72 keeps visual inspection and functional testing on different tables. A smoke detector visual in Table 14.3.1 item 17 is semiannual. The smoke entry test in Table 14.4.3.2 item 17(2) is annual. One last inspection date can produce two next dates.

Is a semiannual row exactly 182 days?

The 2022 summary says semiannual and does not print a day count. 182 days is two times the 91 day NFPA 25 quarterly preset already used for gauges. Confirm the interval with your AHJ and your contractor before you rely on it for a filing.

What if my city still uses an older NFPA 72 edition?

Use the edition named by your authority having jurisdiction. The tables cited here are the 2022 summary checked 30 Oct 2026. Shorter local rules win. Change the interval on the asset when you know the local number.

Which date should I type as the last inspection?

The date the work was actually finished, not the day you plan to book the next visit. A guessed last date produces a guessed next date.

The printable set and the calculator sit on Templates.