Fire extinguisher inspection checklist
Print the monthly tag blank, keep the annual contractor date on its own clock, and get mail before either one slips.
Get an email before the next inspection is due. 1 site free, no card.
How to fill the monthly tag check
- Write the tag and the spot. Record the tag or asset ID and the place the cylinder actually hangs. Two units in one corridor need two IDs.
- Check that you can reach it. Note a blocked cabinet, a missing bracket, a dented shell, a cracked hose, or a blocked horn. If you cannot reach the unit, that is the finding.
- Read gauge, pin, and seal. Mark the gauge only when it sits in the operable band. Mark the pin present and the seal intact, or write the miss. The field guide on the blank names those observations for the monthly visual.
- Initial the monthly line only. Date and initial the monthly line when the unit can stay in service. Leave the annual line blank unless a qualified person finished maintenance that day.
- Name the defect in plain words. Write blocked, discharged, gauge outside the band, or overdue hydro. A code only the vendor knows does not help the owner.
- Save the same date on the asset. Record the walk so the next reminder follows the 30 day monthly visual preset. A saved pass moves the following due date, so save a pass only when the cylinder is fit for service.
A cylinder tag records a walk. It never sends mail when nobody walked. A monthly initial and a yearly service ticket answer different questions. Print a short checklist for the person on the floor. Keep the contractor date on a list that still exists after the ink on the tag fades.
What you print
The files under the heading are the portable extinguisher blank, the filled example, and the field guide from the inspection report pack. No login. Word when you want to edit. Letter and A4 when the cabinet still wants paper.
Use the blank on a real walk. Open the filled example when a new tech needs to see a completed row. The names in that file are sample data, not a customer result. Do not hand the example in as a finished visit. The field guide lists the row: building name, full address, tag or asset ID, agent type, monthly visual, annual maintenance, hydro due, a deficiency the owner can act on, and separate next due lines.
If the authority having jurisdiction names another form, use that form. The blank carries the same warning as the rest of the pack. It is not an official NFPA form.
Monthly owner visual versus annual contractor maintenance
Building staff can own the short walk. A qualified person owns yearly maintenance. One shared line hides the date that costs money when it slips. Twelve monthly initials do not prove the yearly service happened. A contractor ticket from last March does not prove anyone looked at the gauge during the current month.
| Detail | Monthly owner visual | Annual contractor maintenance |
|---|---|---|
| Who walks it | Building staff or the responsible person | A qualified person, usually the contractor |
| Interval stored on the preset | 30 days | 365 days |
| What you write | Date and initials on the monthly line | Service date, name, and pass or fail |
| What it does not prove | That yearly maintenance happened | That the current month was walked |
| Where the proof sits | Tag on the cylinder plus the owner sheet | Service ticket or PDF |
The 30 day figure is the interval stored on the preset titled NFPA 10 monthly visual inspection. The 365 day figure is the interval stored on the preset titled NFPA 10 annual maintenance. The due date table footnote for the visual says the day count matches that monthly preset. The maintenance footnote says a qualified person performs the work and the day count matches that yearly preset. Hydrostatic testing and the six year internal job sit on other NFPA 10 presets. They are not the monthly row and they are not the yearly row.
Those two day counts are the pair the fire inspection due date calculator returns for a portable extinguisher. The NFPA inspection frequency lookup lists the same family: a visual on a monthly rhythm, maintenance by a qualified person each year, internal work on a 6 year rhythm for stored pressure units that follow a 12 year hydro cycle, a 5 year hydrostatic interval for water, wet chemical, foam, and carbon dioxide, and a 12 year hydrostatic interval for stored pressure dry chemical and halogenated agents. Your authority having jurisdiction picks the edition and can demand a shorter gap. Set the interval to the edition they adopted. The product does not adopt a code edition for your city and it does not certify a cylinder.
Alarm frequencies are a different standard. Where a table and an item exist, they belong to NFPA 72 (2022) Table 14.3.1 and Table 14.4.3.2. The source notes were checked on 30 Oct 2026. Those rows do not set a cylinder's monthly or yearly date. Do not borrow an alarm interval for an extinguisher.
How a filled example row is laid out
The example file is a picture of the layout. Sample site Northwind Plaza. Sample address 1200 Harbor Ave. Sample inspection date 2026-03-12. Sample company Apex Fire Protection. Unit E-12 is an ABC dry chemical on Level 2 east stair, monthly pass 2026-03-01, annual service 2026-03-12, no deficiency. Unit E-13 is a carbon dioxide cylinder in the lobby, gauge in the yellow band, with a note to recharge before the next monthly walk. Copy the shape of those rows. Do not copy the names onto a live building.
Your own row needs the agent you actually have. The generator and the field guide name dry chemical, carbon dioxide, water, wet chemical, foam, and clean agent. Write the agent so a later reader does not apply a water hydro rule to a clean agent cylinder in a server room.
What the monthly line is for
Walk with the blank or with the tag already hanging on the unit. The ordered steps above are the fill order.
Start with identity. Tag or asset ID, then the spot where the unit actually hangs. Two cylinders in one corridor need two IDs. A room nickname alone fails the next person who did not walk it with you.
Then look. Is the unit where it belongs. Is a pallet stacked in front of the cabinet. Is the bracket there. Is the shell dented, the hose cracked, or the horn blocked. If you cannot reach the unit, that is the finding. Do not mark a pass because the cabinet was awkward and you moved on.
Gauge, pin, and seal are the observations people skip when they are late for another floor. If the gauge sits outside the operable band, the monthly line is a fail. If the pin is missing or the seal is broken, the monthly line is a fail. Write the date and your initials only on a unit you are willing to leave in service.
Leave the yearly line empty unless a qualified person finished maintenance on that same day. A monthly initial in the yearly box is how a missed contractor visit disappears.
Deficiencies an owner can hand to a vendor
Write the problem in words a building manager can forward. Blocked. Discharged. Gauge outside the band. Overdue hydro. "See notes" is not a deficiency.
A failed unit stays visible until someone repairs it and records a pass. Recording a visit advances the following due date. Save a pass only when the cylinder is fit for service. A failed walk should remain overdue until the repair is real.
Photograph a physical problem: a pallet in front of the cabinet, a missing pin, a gauge in the yellow or red. Put the file name on the row so the PDF still makes sense without the camera roll.
Hydro and the six year job stay on their own clocks
The tag often carries more than one punch. Yearly maintenance is one. Internal maintenance on a six year rhythm is another. Hydrostatic testing is another, and the year depends on the agent. Water, wet chemical, foam, and carbon dioxide follow the 5 year hydrostatic preset. Stored pressure dry chemical and halogenated agents follow the 12 year hydrostatic preset. Read the date off the tag or the manufacturer table. Do not fold those dates into the monthly line.
If you want a reminder for each of them, give each interval its own asset. One asset with one next date hides the shorter walk behind the longer one, or the reverse. The calculator shows the monthly and yearly pair only. It will not collapse hydro into that pair. Track hydro when the tag says the test is coming due.
After the walk
Put the same units on a site. Location, agent, last monthly date, last yearly date. Upload the finished sheet or the contractor PDF on the matching asset. Free covers 1 site and 25 assets at $0 a month, with mail to you and no card. Notices go out 30 days ahead, then 14 days, 7 days, 3 days, and on the due date. Starter covers 10 sites and 500 assets at $39 a month, including client mail and date reading from uploaded reports. Pro covers 50 sites at $79 a month, with 5 seats and a logo on the owner facing site PDF. Business runs $149 a month, with no site cap, 15 seats, API access, and CSV export. Read the yearly figures on pricing before you promise a client a plan.
When the walk is logged, Track due dates free so the next punch is not a memory.
Fire extinguisher tag tracking is the companion for shops that already punch tags and want the due date off the cylinder. Alarm and sprinkler files remain listed on the fire inspection report template. The cabinet book that also covers lights, doors, and drills is the fire safety log book template. When the marshal asks about every class on one walk, start from the annual fire inspection checklist and keep extinguishers as their own rows.
| Feature | FireCert Clock | Cylinder tag alone |
|---|---|---|
| Mail before the date | Yes, at 30, 14, 7, 3, and 1 day | No |
| File after the visit | Upload on the asset | Punch stays on the cylinder |
| Starting price | $0 a month for 1 site and 25 assets | No software fee |
| Yearly versus monthly | Two dates when you split the assets | Easy to share one line |
Hang the tag where the code wants a tag. The schedule and the file live in the account so you can see which cylinders are coming due before you walk the whole floor.
Who should initial
Name one responsible person even when a vendor does the yearly work. The monthly walk fails when everyone owns it and nobody does. Pick one person per building for the visual. Name the contractor for maintenance. From Starter, add the property manager as a client contact so they receive the same reminder mail. Technicians can subscribe to an iCal feed for assets assigned to them.
You receive the mail on every plan. Client copies start on Starter. Slack and Teams start on Starter. The overdue list is on every plan, including Free.
A route with many buildings
Each building is a site. Import a CSV when the last vendor already gave you locations and last service dates. The importer takes site, asset type, location, and last service date. You do not need every hydro date perfect on the first afternoon. You need the monthly gap and the yearly gap visible.
When the extinguisher vendor changes, import the new export. Do not trust punches the previous company never performed. Keep the old PDFs on the visits so the history does not leave with the truck.
A warehouse rack unit, a kitchen wet chemical unit, and a unit on a vehicle can share a site and still need different hydro presets. Split them. The kitchen unit is easy to forget when the route thinks only about ABC dry chemical in the corridors. A vehicle unit leaves the building. Give it a location string that names the truck, not the bay it parked in last Tuesday.
Clean agent cylinders in server rooms still get a monthly visual. The agent written on the row stops someone from applying a water hydro rule to a cylinder that does not use it.
Seasonal and lightly staffed buildings
Schools and seasonal shops sometimes pause walks when the building is closed. If your authority having jurisdiction still expects the monthly visual, the date does not pause because the lights are off. If they allow a gap, change the interval on the asset for the closed season. Do not leave a stale pass on the tag and call the year complete.
A site with one person on duty needs the monthly job short enough to finish. Identity, reachable, gauge, pin, seal, initials, deficiency. Save the longer maintenance notes for the contractor visit.
Before an insurer or a marshal asks
Risk engineers ask for evidence, not a memory of who initialed March. Export the site PDF. It lists each asset, last service, next due, and the uploaded files. Pair it with the paper tags still on the cylinders. When a binder page is missing, the uploaded sheet is the backup.
Send the site PDF to each contractor before the visit week so the scope is agreed before anyone rolls a truck. Upload each finished ticket to the matching asset. From Starter upward, confirm the dates the upload reader found before you trust the next notice. The notice cycle starts again from the date you confirm.
On Pro the owner facing PDF carries your logo. Business is the plan with API access and a CSV export when another system needs the dates.
What the checklist will not do
It will not discharge a unit, weigh an agent, or sign as a licensed technician. It will not tell you which edition your city adopted. It will not replace the contractor letterhead when the contract names that form. It stores dates and files. You still book the trade and you still hang the tag.
Cabinets people walk past
The failures that show up in a marshal report are ordinary. A pallet slid in front of a cabinet after a delivery. A pin pulled during a drill and never replaced. A gauge left in the yellow band because the recharge was "next week" for three months. A vehicle unit still listed at the shop after the truck was sold. The checklist is how those findings get a date and a name instead of a shrug.
Write the finding the day you see it. A note in a group chat is not a record the next manager can find. The row on the blank, plus the file on the asset, is the record.
If a unit is removed, archive it or stop the reminders. A due date for a cylinder that left the building creates noise, and noise is how real dates get ignored. If a unit is added, give it an ID before the first walk so the second walk can find the same cylinder.
Training a new walker
Hand the new person the filled example and one live floor. Ask them to complete five rows while you watch. Check that they wrote an ID, a real location, the agent, and a pass or a named defect. Correct a pass that skipped the gauge. The second floor they can walk alone. That hour saves a month of tags that say OK with no date.
Keep a spare blank in the cabinet. A phone photo of a blank row is a poor substitute when the printer is in another building. The Word file is there when you want your company name in the header before you print a stack.
The internal examination on a 2190 day preset, kept off the monthly tag, is six-year extinguisher maintenance.
FAQ
Does a monthly initial replace yearly maintenance?
No. The monthly preset is 30 days. Yearly maintenance by a qualified person is the 365 day preset. One initial cannot stand in for the other.
Can I download the blank with no account?
Yes. Word, Letter, and A4 copies of the extinguisher blank, the filled example, and the field guide are available with no login.
What if the gauge sits outside the operable band?
Mark the monthly line as a fail, name the defect, and leave the unit overdue until someone repairs it and records a pass.
Where do the day counts come from?
They match the NFPA 10 presets already used for scheduling. Monthly visual inspection is stored as 30 days. Yearly maintenance is stored as 365 days. The due date table footnotes say the day counts match those presets. Confirm the edition with your AHJ.
Should hydro share the monthly asset?
No. Hydrostatic intervals and the six year internal maintenance are separate presets. Give them their own assets when you want those reminders.
Is the blank an official NFPA form?
No. Use the form your AHJ names when they name one. The blank is a starting layout for the tag walk and the report row.
The printable set and the calculator sit on Templates.
Support and Terms. Calculator.