FireCert Clock

Fire inspection tracking for facilities teams

Each asset has a next due date. Facilities needs that list on Monday, not a binder in a locked riser room.

Property managers and HSE teams use the same due list when the portfolio grows.

Facilities teams inherit vendors, faded tags, and a log book nobody updated since August. The fire marshal still asks for last year's emergency lighting test. Fire inspection tracking for facilities means one site list with every extinguisher, panel, exit light, and hood you are responsible for, each with a next due date you can read on Monday morning.

If you are shopping field service suites, start with the ServiceTrade alternative page, then read ServiceTrade pricing (vendor-verified, dated) and ServiceTrade vs Uptick if you are comparing field platforms. Facilities tracking here is about due dates, not dispatch or invoicing.

What to load first

Portable extinguishers. Location, type, last service, next due.

Fire alarm panel. Annual and quarterly tasks differ by system.

Sprinkler valves you own. Weekly seal checks vs annual contractor visits belong on different assets.

Emergency lighting. Monthly quick checks and annual duration tests are different dates.

Kitchen hood suppression. If facilities holds the contract, track suppression and exhaust clean separately.

Import a CSV when the last technician left a spreadsheet. Assign a technician user so their iCal feed fills with upcoming work.

Monday morning workflow

Open the overdue list before the building walk. Fix what is yours. Send the site PDF to vendors for what is theirs. Upload tickets after visits so next due dates move forward. Anything still overdue stays red until someone logs service.

Free is $0 a month for 1 site, 25 assets, and email reminders. Starter is $39 a month for 10 sites, 500 assets, client contact emails, Slack and Teams, and AI date reading from uploaded reports. Pro is $79 a month for 50 sites without an asset cap, branded client reports, and five seats. Business adds API and CSV export at $149 a month.

Who gets mail

You always get notices at 30, 14, 7, 3, and 1 day before due. Add the contractor as a client contact on Starter if they should see the same reminders. Set the interval when you add each asset if your fire marshal enforces something stricter than a preset.

Contractors without losing control

Facilities often coordinates while licensed contractors perform tests. Share the PDF export or grant client contacts instead of forwarding screenshots. You keep the master list even when vendors rotate.

Proof for audits and insurers

The one-click site PDF lists assets, last service, next due, status, and attached certificates. Tags on equipment still matter where code requires them. This product keeps the schedule and the paperwork aligned.

Built for one building or a small portfolio

You do not need a dispatch suite to know extinguisher 3F-east is due Thursday. FireCert Clock is a tracker, not invoicing or truck routing.

UK and US presets

US presets follow common NFPA patterns. UK presets cover BS 5306-3, BS 5839-1, and BS 5266. Set the interval when you add each asset to match local enforcement.

Intervals facilities actually walks

Extinguishers use a 30 day visual and a 365 day yearly maintenance interval from the NFPA 10 presets. Alarm testing can sit on the NFPA 72 annual preset, 365 days, plus any shorter task the vendor contract names. Sprinkler valves you own are often a 7 day sealed check, or about every 30 days when the valve is locked or electronically supervised, which is the rhythm on the frequency lookup. Emergency lighting splits a 30 day, 30 second functional test from a 365 day, 90 minute discharge under NFPA 101. A hood, when facilities holds the contract, often sits near 182 days, which doubles one quarterly gauge interval of 91 days. UK buildings can use the BS 5306-3, BS 5839-1 and BS 5266 presets. The BS 5839-1 preset is 182 days. Set the interval when you add the asset if the fire marshal is stricter than the preset.

What Monday's export should contain

Each row needs a location a new tech can find, the task name, last service, next due, and the file from the last visit. The site PDF is the packet. Tags on the equipment still matter where your program requires them. Retire the shared sheet after import. Two calendars drift, and Monday starts with an argument instead of a walk.

Who signs off

In-house staff often sign monthly visuals and 30 second light tests. Contractors sign annual alarm, sprinkler, hood, and 90 minute discharge reports. Facilities confirms the date after upload on Starter so a vendor change does not erase the history. The product does not certify systems and does not replace the monitoring company.

Failures on a single building

The 90 minute discharge hides behind twelve 30 second passes stored on one row. A hood ticket lands in a personal inbox. The Monday walk starts at the riser and never reaches the kitchen. A contractor rotation leaves last year's PDF off the asset, so the overdue list looks empty when the marshal arrives.

Worked due date for exit light EL-12

Clinic lobby, exit light EL-12, NFPA 101 annual discharge, 365 days. Last full test 11 August 2025. Next due 11 August 2026. Notices fall on 12 July, 28 July, 4 August, 8 August and 10 August, the 30, 14, 7, 3 and 1 day marks before 11 August. The 30 second test stays on a second asset at 30 days. Passing April's push-button test does not move August's discharge. From 11 August 2025 to 11 August 2026 there is no leap day, so 11 August comes around again.

Several buildings in one overdue list, with a technician feed, are a multi-site inspection calendar. A review date taken from a UK assessment, rather than from an equipment preset, is fire risk assessment review reminders.

FAQ

We only have one building. Is that Free?

Yes. 1 site, 25 assets, email reminders.

Can I share the overdue list with a vendor?

Send the site PDF, or add them as a client contact from Starter.

Does this replace our fire alarm monitoring vendor?

No. It tracks inspection due dates and stores reports.

Can in-house staff use iCal?

Yes. Each technician can subscribe in Google Calendar, Outlook, or Apple Calendar.

What if we outgrow 25 assets?

Upgrade to Starter for 500 assets across ten sites, or Pro when you need unlimited assets per site.

Can corporate safety see all sites?

Use Business CSV export or API to feed a central dashboard if you build one.

Handoff from spreadsheets

Most teams import once, then ban the shared sheet. Make FireCert Clock the only editable schedule so email threads stop contradicting the master list.

Capital planning

Use the overdue and upcoming lists when budgeting contractor spend. Finance sees dates, not anecdotes. CSV export of assets is on Business if you need a spreadsheet.

Joint commission and healthcare

Hospital facilities often face unannounced life safety surveys. A single PDF per site with emergency lighting and extinguisher rows together matches how surveyors ask questions on the floor.

Vendor scorecards

When you manage multiple vendors, use the overdue list in quarterly reviews. The overdue list shows every late asset, oldest due date first, without opening email archives.

Elevator and life safety coordination

Some campuses pair fire watch walks with extinguisher checks. Note paired tasks in asset locations so technicians batch work without missing a due row.

Monday list questions

Who signs the 90 minute discharge?

Usually the contractor who ran it. In-house staff more often sign the short monthly functional test. Confirm the date so the file stays on the asset.

What should Monday's list show?

Location, task, last service, next due, and the attachment. Red rows are the walk. Green rows can wait.

How do two calendars drift after import?

Someone still edits the old sheet. Make the asset list the only schedule you update.

Set up a site free

Set up a site free