Form 3 Annual Proof for South Australian Safety Provisions
Maintenance is by calendar year. The proof deadline is 60 business days after 31 December. The confirmed date is yours.
Regulation 94(9) of the Planning, Development and Infrastructure (General) Regulations 2017 requires maintenance and testing of essential safety provisions on an annual basis according to calendar years. The owner of a building that has been issued with a schedule must not use the building, or allow it to be used, unless that maintenance has been done so the provisions still perform to the standard required at installation.
Regulation 94(10) then sets the paperwork clock: not later than 60 business days after the end of each calendar year, the owner provides adequate proof to the council for that year. If the building is outside a council area, regulation 94(11) sends the same verification to the Commission. The authorised regulations are https://www.legislation.sa.gov.au/__legislation/lz/c/r/planning%20development%20and%20infrastructure%20(general)%20regulations%202017/current/2017.24.auth.pdf
Ministerial Building Standard MBS 002 (May 2023) section 6 says the Chief Executive's form for that proof is Form 3, ESP maintenance verification, published on the SA planning portal. The form list is https://plan.sa.gov.au/resources/forms
The standard also says the verification covers critical defects as defined in AS 1851, and non critical defects and non conformances, including where steps are being taken to rectify them. FireCert Clock does not apply AS 1851 and does not decide whether a defect is critical. The person who did the maintenance writes that on the form.
Why no date is proposed
A business day count depends on weekends and on the public holidays in that year. Adding 60 calendar days to 31 December, or picking a fixed day in March, would be a different rule from regulation 94(10). The Form 3 row therefore leaves the proposed date empty. Type the day you will treat as the deadline after you have counted the business days, or the day you actually lodged, in the confirmed field. Reminders start only after that confirmation.
The building profile has a second date: the day the annual proof was given to the council. That is a record of lodgement. It is not a substitute for the confirmed deadline if you want a reminder before you lodge.
Exemptions sit in regulation 94(12): a Class 1b building, and a Class 3, 4, 5, 6, 7, 8, or 9b building with a rise in storeys not over 2 and a floor area not over 500 square metres, unless the council has required compliance under regulation 94(13). Performance solutions, variances from the Building Code performance requirements, and a section 157 notice are the cases regulation 94(13) names. If the building is exempt, you can leave the confirmed date blank. The row stays on the building so the schedule is not forgotten.
Regulation 94(14) states the maximum penalty of $10,000 and the expiation fee of $750 for missing this proof duty. Those amounts are the regulation's, not a calculator output.
Upload last year's proof and we fill it in for you
Upload the Form 3 you already lodged and review the suggested council date. You count the 60 business day deadline. The steps are on upload a South Australian ESP form.
The installation certificate, which is a different form, is SA Form 2 compliance certificate. The schedule the proof has to cover is SA ESP schedule and records. The overview is South Australian essential safety provisions.
Presets are a guide. Confirm the deadline with the council that receives the form. Your schedule takes precedence. FireCert Clock does not lodge Form 3.
Not later than 60 business days, and why no date is proposed
PlanSA's Form 3 page, read 9 Nov 2026, says that unless the regulations exempt the building, the owner provides annual maintenance verification to the council not later than 60 business days after the end of each calendar year in which the required maintenance and testing were carried out. Form 3 is the approved form for regulation 94(11). Outside a council area, give it to the State Planning Commission. https://plan.sa.gov.au/resources/forms/Form_3_-_ESP_maintenance_certificate
MBS 002 (May 2023) section 6, read 9 Nov 2026, says that proof states there are no outstanding critical defects, as AS 1851 defines them, that would leave the provisions inoperative, or that those defects are rectified or being rectified, and that non critical defects are being remedied. Section 6.3 says Form 3 is not required for a Class 1b building, or for a class 3, 4, 5, 6, 7, 8, or 9b building that does not exceed 2 storeys and 500 square metres, unless a section 157 notice or a performance variation applies. https://plan.sa.gov.au/__data/assets/pdf_file/0006/1214187/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-3.pdf
The product does not count 60 business days. Public holidays and weekends move the last lawful day. You count it and confirm the date you will use.
How to track the proof
| Feature | What you count | What you store | What you do not ask the product to do |
|---|---|---|---|
| Calendar year | Maintenance and testing for that year, regulation 94(9) as MBS 002 describes it | The records and condition reports | Decide that a visit in January covers the previous year |
| 60 business days | From 1 January, skipping weekends and the public holidays that apply | The day you confirmed | Use a statewide 15 March |
| Recipient | Council, or the Commission outside a council area | The date you submitted it | Send the form |
| Exemption | Section 6.3 conditions, all of them | A note of why Form 3 was not sent | Assume every shop under 500 square metres is exempt |
Upload on upload an SA form. Form 2 is a different certificate: Form 2. The schedule is Form 1. The pillar is essential safety provisions.
Is 1 March a safe default?
Only if you have counted 60 business days for that year and 1 March is on or before the last lawful day. A leap in public holidays can make a copied date late. Confirm a fresh count each January.
Does the standard set the expiation in dollars?
The sections read say an expiation fee can be applied under regulation 94(9) for using a building where required maintenance and testing were not done. They do not state the dollar amount in the passages relied on here, so no dollar figure is given.
FAQ
Is the maintenance year the same as the proof deadline?
No. Maintenance and testing are for the calendar year. The proof is due not later than 60 business days after that year ends.
Can I use the date the contractor finished in November?
You can store that visit on the provision line. The regulation's proof deadline is still tied to the end of the calendar year, not to the contractor's last worksheet, unless the council has told you otherwise in writing.
Does Form 3 go to the council every year for a house?
Class 1a houses are outside the Class 1b and Class 3 to 9b exemption wording. Read regulation 94(9) and (12) against the classification on the approval before you assume a filing duty.