FireCert Clock

Fire extinguisher tag tracking

Initials on a tag are easy to skip. Give each cylinder an asset, a last service date and mail before the next punch is due.

Next annual from a punched tag

The tag is the field record. It does not email anyone. Put the unit number, location, agent and last punch on an asset. After a monthly walk, log the visit. After annual maintenance or a hydro, upload the ticket and confirm the next due.

Monthly versus annual versus hydro

Three clocks. A monthly visual can live on a short interval. Annual maintenance is a year. Hydro is 5 or 12 years by agent. Split them if you want three sets of reminders. One asset is enough if one person does all three and you accept one next date.

Tags still hang on the unit

Where the code wants a tag, hang the tag. FireCert Clock holds the schedule and the file so you know which units are coming due without walking the whole floor first.

Three clocks on one cylinder

Fire extinguisher tag tracking means the tag stays on the cylinder and the due date lives on an asset. Initials on a tag do not send mail. After a monthly walk, log the visit. After annual maintenance or a hydro, upload the ticket and confirm the next due. Where the code wants a tag, hang the tag. The list tells you which tags are coming due before you walk the whole floor.

Use the same NFPA 10 frequencies as the frequency lookup. Visual inspection is monthly, about every 30 days. Maintenance by a qualified person is annual. Internal maintenance on stored-pressure units that need a 12-year hydro is every 6 years. Hydrostatic tests are every 5 years for water, wet chemical, foam, and CO2, and every 12 years for dry chemical stored pressure and halogenated agents. Those rows are the presets. Your AHJ decides the edition. FireCert Clock is not an AHJ.

Worked example. Unit 14, east stair, dry chemical, last monthly punch 1 Nov 2026, last annual 15 Jan 2026, last hydro 15 Jan 2018. The next monthly visual is about 1 Dec 2026. The next annual is 15 Jan 2027. The next 12-year hydro is 15 Jan 2030. If you keep one asset, you pick one next date and the other two live in the notes and the uploaded ticket. If you keep three assets, each clock has its own reminder ladder: 30, 14, 7, 3, and 1 day. A missing tag is a defect on the visit, and the overdue list keeps the unit visible until someone hangs a tag and records the date.

Plans, from pricing, with no new prices. Free is $0, 1 site, 25 assets, email reminders. Starter is $39 a month or $390 a year, 10 sites, 500 assets, client emails, AI date reading. Pro is $79 a month or $790 a year, 50 sites, no asset cap, 5 seats, branded reports. Business is $149 a month or $1,490 a year, 15 seats, no site cap, API and CSV. Yearly is 10 months. CSV import is the path for a vendor's last unit list: location, type, and last service, then the NFPA 10 preset.

Do not copy emergency-lighting intervals onto these tags. Emergency lighting test log uses NFPA 101: a 30-second functional test monthly and a 90-minute discharge annually. That is a different asset. Extinguisher tags stay on NFPA 10. The switch form is how you move a building you already track somewhere else.

Who it is for: techs who already punch tags and need the office to know which punch is late. Who it is not for: a tag printer. The product stores the date and the file. The physical tag is still yours. Who it is not for: a team that wants one blended "inspection" date to stand in for hydro. Hydro is 5 or 12 years by agent. Hiding it inside the monthly row is how a cylinder misses a test.

What the office records after the walk

The tech still initials the tag. The office records the same visit on the asset the same day, with the unit number and the location, so the two do not drift. A tag that says November and an asset that says August is the defect you are trying to see without walking every floor. Upload a photo of a damaged tag if that is the evidence you keep. The overdue list is the units with no visit recorded by the next date, not the units someone remembers punching.

Hydro labels are the long clock. Do not let a fresh monthly sticker convince anyone the 5-year or 12-year test was done. The asset should show the hydro date as its own field or its own asset. Business and Pro add seats so the tech and the office are not sharing one login. Free and Starter are one seat. If two people must record visits, that is the upgrade, at the prices already on pricing. CSV export on Business is how a contract handover leaves with the dates instead of a box of tags.

Match the collar to the asset before you leave the floor

A tag only helps the next person if the unit number on the metal matches the asset name in the list. Before you punch, read the location line against the stair, the cabinet, or the column number. If the asset says east stair, level 2 and you are standing in the west stair, stop. Punching the wrong cylinder makes the collar and the visit look current while the real unit stays overdue.

Write the visit the same day the walk happens. A Friday punch typed the following Monday looks late even when the collar is honest. The note should name what you saw: initials present, collar torn, hydro label unreadable, cabinet blocked, or unit missing. A photo of a torn collar is evidence. It does not replace hanging a new collar and recording that date.

Keep the hydro label in its own sentence when the visit is only a monthly look. A fresh monthly punch does not mean the long test was done. If the hydro label is painted over or the year is worn off, say that in the note and leave the hydro date unchanged until the person who performs that test records a new one. Folding both facts into one sentence is how a short walk overwrites a long clock.

When a room is locked, record that unit as not seen and name the door. A walk that skips locked rooms will show every reachable unit as current and hide the ones nobody opened. The overdue list should keep the locked unit until someone opens the door and records a real look.

Hand the route back in three groups: punched and logged, defect on the collar, and not reached. The office should not have to guess which of those a blank row means. If two people share the route, each person logs the units they actually saw. One login that records a whole floor after a partial walk will mark units nobody opened.

The stamp year on the cylinder is a different clock from the hanging tag. Mail for that stamp is NFPA 10 hydrostatic test reminders.

FAQ

Can I import a unit list from the last vendor?

Yes. CSV with location, type and last service. Pick the NFPA 10 preset when you add each asset.

What if a tag is missing in the field?

Log that on the visit as a defect. The overdue list keeps the unit visible until someone hangs a new tag and records the date.

Set up a site free

Set up a site free