Emergency lighting test log
Monthly 30-second tests and the annual 90-minute test are two dates. Log both, or the annual hides behind a page of monthlies.
Downloadable log templates
Blank log (monthly and annual columns): Word (.docx) · Letter (US) · A4
What to record: Word (.docx) · Letter (US) · A4
Download the Word or PDF log above with separate columns for the monthly thirty-second test and the annual ninety-minute discharge, then upload the signed sheet after each walk. Emergency lighting fails quietly. A monthly thirty-second push-button test takes minutes. The annual ninety-minute discharge takes planning, ladders and often a different vendor. When both tasks share one notebook row named "emergency lights," the annual hides behind twelve monthlies that nobody filed. NFPA 101 commonly uses a monthly functional test and an annual duration test in US programs. UK sites following BS 5266 use their own pattern. Pick the preset when you add the asset, and set the interval to match what your AHJ or insurer requires. The product tracks due dates and stores uploads after visits. It does not perform the test for you.
How to split the log
Monthly functional tests. One asset per floor, per circuit, or per run of fixtures if you test them together during the walk.
Annual ninety-minute discharge. A second asset if a different crew or contractor runs the long test. Two assets mean two reminder streams.
Log a visit only when the unit passes, since logging moves the next due date.
What to capture on the visit
Fixtures exercised, battery or unit replacements, and duration readings on the annual. Upload the sheet or photo on the visit. The due date drives reminders from the service date you log.
Photos of failed units help maintenance order parts before the next walk.
Reminder days
Notices go out 30, 14, 7, 3 and 1 day before the due date. On a monthly test, the 7-day, 3-day and 1-day notices are the ones that matter because the window is short. On the annual, the thirty-day notice gives time to schedule lifts and after-hours labor.
Add the building engineer as a client contact on Starter if they perform monthlies while a vendor owns the annual.
Free is $0 a month for 1 site and 25 assets. Starter is $39 a month for client emails and AI date reading when you upload contractor reports. Pro adds branded site PDFs. See pricing.
Proof for the fire marshal
The site PDF lists each asset, last service, next due and status with attachments. Hand it to the inspector instead of flipping through a binder missing February.
CSV import loads fixture locations from a spreadsheet when you already have a prior vendor's list.
Monthly and annual intervals already on the presets
The blank log keeps a monthly column and an annual column because the presets are two different lengths. Logging both tasks on one asset hides the longer test behind the shorter one.
NFPA 101 monthly functional test of at least 30 seconds uses 30 days. Next due is the last passing monthly date plus 30 days. NFPA 101 annual full test of at least 90 minutes on battery uses 365 days. Next due is the last passing annual date plus 365 days.
UK programs that follow BS 5266 use the same split with different names. The monthly flick test preset is 30 days. The annual full rated duration preset is 365 days. Choose the family when you add the asset. Do not store a full rated duration test on an asset whose preset says 30 second functional test, and do not store a monthly push-button walk on the 365 day preset.
Worked monthly log. Last pass 6 March 2026. Preset 30 days. Next due 5 April 2026. The 14 day notice is 22 March 2026. The 7 day notice is 29 March 2026. The 3 day notice is 2 April 2026. The 1 day notice is 4 April 2026. The 30 day mark falls on 6 March 2026, the same day as the pass you just logged, so the notices still ahead of you inside that month are the 14, 7, 3, and 1 day marks.
Worked annual log. Last pass 6 March 2026. Preset 365 days. Next due 6 March 2027. The 30 day notice is 4 February 2027. The 14 day notice is 20 February 2027. The 7 day notice is 27 February 2027. The 3 day notice is 3 March 2027. The 1 day notice is 5 March 2027. Book ladders and after-hours labor from the February notice. The 3 March notice is the last nudge, not the first call to the lift vendor.
A floor tested as one group is one asset per interval. Level 2 east lights, monthly, is one asset at 30 days. Level 2 east lights, annual discharge, is a second asset at 365 days. Twelve monthly passes then cannot stand in for the duration test.
Common misses
One name for both tests. An asset called "emergency lights" with only the 30 day preset never opens a due date for the 90 minute discharge. Add the second asset before the first monthly is logged, so the annual has a last service date of its own.
A failure logged as the visit. Logging moves the next due date. A unit that failed the push-button test should stay overdue until someone repairs it and logs a pass. Keep the failure on the sheet and in the notes. Do not treat the failed walk as the service date.
The long preset on a short walk. A 365 day interval on a monthly program means the office waits a year for a test the program wanted every month. Read the preset label before saving. Monthly says 30 seconds or flick test. Annual says 90 minutes or full rated duration.
Garage and interior on one result. Exterior heads corrode faster than corridor heads. One pass or fail for the whole building hides the zone that actually failed. Split garage levels and exterior egress when those walks are separate.
Panel and remote heads forced onto one date. Central battery and inverter systems are often logged at the panel. Remote heads get their own assets only when the program tests them on a different day. One interval cannot describe two calendars.
The sheet left in email. The due date can be right while the site PDF has no file attached. Upload the signed sheet or the photo on the visit you log. The marshal packet is the asset, the last service, the next due, and the attachment together.
Fit-out heads missing from the original list. Tenant work adds units the base building spreadsheet never had. Add an asset when the walk finds a new head. The import is a start, not a closed inventory.
Labor booked from the 3 day notice. On the annual, the 30 day notice is the scheduling window. Waiting until three days out is how the discharge slips into the following month while the monthly column still looks complete.
FAQ
Can I group a run of lights?
Yes. One asset named "Level 2 east lights" if you test them together.
Do you keep the duration reading?
Upload the sheet or photo on the visit. The due date is what the reminder uses.
Can I track generator-backed egress separately?
Yes. Add assets for transfer equipment if your program treats it apart from unit batteries.
What if a unit fails the monthly?
Log the failure on your own sheet, order parts, and log the visit once the unit passes. It stays overdue until then.
Does FireCert Clock connect to lighting control systems?
No. It tracks dates and files you upload after manual tests.
Which preset is the monthly test?
The 30 day one. NFPA 101 describes a functional test of at least 30 seconds. BS 5266 describes a monthly flick test. Both presets use 30 days.
Which preset is the annual discharge?
The 365 day one. NFPA 101 describes a full test of at least 90 minutes on battery. BS 5266 describes a full rated duration test. Both presets use 365 days.
Why can a year of monthlies hide the annual?
One asset stores one interval. A 30 day interval never creates a due date 365 days out. Put the duration test on its own asset with the annual preset and its own last pass.
Should a failed monthly move the due date?
No. Log the visit when the unit passes. Until that pass is logged, the asset stays overdue.
Can technicians subscribe to light tests only?
Assign those assets to the technician for an iCal feed.
Night-shift testing
Many annuals run after hours. Use the thirty-day notice to book labor before the due date, not the week after.
Battery replacement cycles
When you replace batteries in bulk, confirm next due dates on Starter from the service ticket so monthlies align with the vendor's paperwork.
Parking garages and exterior egress
Exterior fixtures corrode faster. Separate assets for garage levels help you see which zone failed without rerunning the whole building.
Treat each test as a dated asset. The log stops growing holes when the annual has its own row and its own reminder stream.
Related: shoppers comparing due-date products, rather than filling a lighting log, should start with best fire inspection software.
Inverter and central battery systems
Central systems may log at the panel rather than per fixture. Use one asset for the panel discharge test plus child assets for remote heads only when your program splits them.
Code adoption changes
When NFPA 101 or local amendments change test intervals, set the interval when you add a new asset for the revised cycle. To change them, add a new asset.
Tenant spaces
Tenant fit-outs sometimes add emergency units the base building list missed. Add assets when field walks find new heads instead of assuming the original log is complete.