Sprinkler inspection schedule

Weekly valves, quarterly devices, annuals and 5-year internals are different dates. Split the tasks so a weekly does not hide a 5-year.

Find a sprinkler task

NFPA 25 stacks frequencies on one building. A sealed control valve might be weekly. A main drain test might be annual. Internal assessment might be five years. A single spreadsheet row named "sprinklers" buries the rare task until an inspector finds it overdue.

A fire pump is not a sprinkler valve tour. Diesel and electric churn frequencies, and the annual flow points, are on the fire pump test schedule.

Frequencies you may track

Weekly. Control valves in supervised or locked open position, depending on your program.

Monthly or quarterly. Gauges, alarm devices, and dry pipe trips per your edition and occupancy.

Annual. Main drain, alarm tests, and many full-flow items contractors handle.

Five-year. Internal assessment for certain sprinkler types and conditions.

Longer horizons. Fifty-year sampling deserves its own asset with a long interval.

Wet, dry, preaction, and antifreeze systems do not share every task. Pick presets per system type when you add each asset, and set the interval your AHJ or insurer requires.

Use presets, then confirm

FireCert Clock ships NFPA 25 style presets as a starting point. Your authority having jurisdiction sets enforceable intervals. After each visit, upload the report, confirm the dates FireCert Clock reads on Starter, and adjust the interval if the tech noted a different cycle.

Proof for facilities and contractors

Upload the last report PDF. The site export lists assets, last service, next due, and overdue status. Contractors hand the same PDF to the property manager. In-house facilities teams use it for Monday morning standups.

Free is $0 a month for 1 site and 25 assets. Starter is $39 a month for client reminder emails and AI date reading from reports. Pro adds branded client PDFs and more sites. Yearly billing is $390, $790, and $1,490 on paid tiers, which is two months free.

Import instead of retyping

CSV import with site, asset type, location, and last service date fills next due from the preset. Fix rows after import when field names were messy in the old sheet.

Who gets reminded

Email goes to you on every plan. Add the building contact or contractor as a client contact on Starter. Notices fire at 30, 14, 7, 3, and 1 day before due, plus one notice once it is overdue. The overdue list keeps it red until someone logs a visit.

Contractor coordination

Licensed sprinkler contractors often own annual and five-year work while facilities owns weekly valve walks. Split assets so each party's tasks are separate rows with their own dates.

What each task records

A sealed control valve walk records the valve id, whether the seal or lock was intact, the date, and the initials of the person who looked. A gauge row records the gauge id, the pressure read, and the date. A main drain records the test date, the contractor, and the report PDF. An internal pipe assessment records the assessment year and its file on its own asset. The NFPA 25 five-year preset is 1825 days and must not share a next due date with a weekly walk. The frequency lookup already lists the usual NFPA 25 rhythm, including sealed valves, wet-pipe gauges, the main drain, and the internal assessment. Your AHJ can differ. The interval you save is what the mail uses.

Who signs which row

Facilities often initials the weekly or monthly valve walk. The sprinkler contractor signs the annual main drain and the five-year assessment report. Upload that signed file to the matching asset. FireCert Clock does not sign the test and does not replace the contractor. A green weekly row does not mean the contractor signed the drain.

Failures a single sprinkler line creates

A weekly valve check marked done hides a five-year internal that nobody created as an asset. A dry-pipe trip gets typed onto the wet gauge row, so the trip interval is wrong. An antifreeze test is skipped because the main drain PDF looked complete. A long-horizon sample never gets a row even when the lookup calls out later replacement or sample testing. Separate assets for separate tasks. The fire pump test schedule stays off the riser row as well.

Worked due dates on riser R-2

North Mill, wet riser R-2. Main drain asset on the NFPA 25 annual preset, 365 days. Last test 7 April 2025. Next due 7 April 2026. Notices fall on 8 March, 24 March, 31 March, 4 April and 6 April, the 30, 14, 7, 3 and 1 day marks before 7 April. The span from 7 April 2025 to 7 April 2026 has no leap day, so the annual preset lands on the anniversary. The internal assessment for that riser, last done 7 April 2021 and stored on the 1825 day five-year preset, comes due on 6 April 2026. The shift happens because 29 February 2024 sits inside that day count. Logging the drain does not log the internal.

Once those NFPA 25 tasks are separate assets, a portfolio view that sorts them with the other buildings is a multi-site inspection calendar.

FAQ

Can I import a valve list?

Yes. CSV with site, type, location and last service. The interval preset fills the next due.

What about 50-year sprinkler sampling?

Add it as its own asset with a long interval.

Does FireCert Clock replace the sprinkler contractor?

No. It tracks dates and paperwork.

Can one building mix occupancies?

Yes. Use separate assets per system or wing when intervals differ.

What if NFPA edition changed?

Set the interval when you add each asset. Your AHJ interpretation is the source of truth.

Can technicians use mobile?

Log visits and upload reports from the field. Confirm dates on Starter after upload.

Dry pipe and preaction nuance

Dry systems add trips and air pressure checks that wet systems skip. Duplicate the asset row when a campus mixes system types in one riser room.

Winter freeze plans

Facilities in cold climates often add seasonal tasks. Use a custom interval on the asset rather than overloading the weekly valve row.

Auditor walk preparation

Walk the overdue list, oldest due date first, before the inspection. Fix tags and paperwork for red rows first so the conversation stays on exceptions, not surprises.

Campus maps and barcodes

Use the location field for building wing and room so technicians match valves on the PDF to physical tags during annual contractor visits.

Historical reports

Keep every annual report attached to the asset. Inspectors sometimes ask for three years of main drain tests, not only the last tag date on the valve.

When AHJ inspectors request five years of valve inspection history, attached PDFs on each asset answer the question without scanning email.

Small teams still benefit when weekly valve walks and annual contractor visits each have their own row instead of one vague "sprinklers" line on a sheet.

Drain and valve questions

Who signs the main drain report?

The contractor who ran the test. Facilities can initial valve walks. The product stores the files. It does not sign them.

What belongs on a valve walk asset?

Valve id, seal or lock condition, date, and initials. Gauge pressure belongs on the gauge asset.

Why can 1825 days land a day early?

The preset counts days. A leap day inside the span moves the calendar date by one. Confirm the date you want saved before you trust the notice.