Form 2 Certificate of Compliance for South Australia

The installer signs Form 2 when the provision is installed. Where no occupancy certificate will be issued, regulation 94(8) allows 20 business days.

Regulation 94(5) of the Planning, Development and Infrastructure (General) Regulations 2017 says a certificate of compliance must be provided for each essential safety provision specified on the schedule. Regulation 94(6) says that certificate is in the form the Chief Executive determines and publishes on the SA planning portal. Ministerial Building Standard MBS 002 (May 2023) section 5 calls that form Form 2, the ESP compliance certificate.

The authorised regulations are https://www.legislation.sa.gov.au/__legislation/lz/c/r/planning%20development%20and%20infrastructure%20(general)%20regulations%202017/current/2017.24.auth.pdf

MBS 002 is https://plan.sa.gov.au/__data/assets/pdf_file/0006/1214187/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-3.pdf

When Form 2 is due

Regulation 94(7) says the certificate must be provided on completion of the installation. It must be signed by the person who installs the provision or, if a company installs it, by a manager or other person the company employs or engages who is responsible for managing that installation. It goes to the entity that will issue the certificate of occupancy, or, if no certificate of occupancy will be issued, to the council, or to the Commission if the building is outside a council area.

Regulation 94(8) adds a number only for that second path: the certificate to the council or Commission must be provided within 20 business days after installation. MBS 002 section 5.4 and 5.5 also describe endorsement by the licensed building work contractor, or by the owner where there is no such contractor, and forwarding with the statement of compliance required by regulation 104.

Twenty business days is not turned into a proposed calendar date here. Public holidays differ, and the trigger is the completion of an installation, which the product cannot see. Turn the Form 2 row on when you are tracking an installation, type the completion date, and confirm any deadline you have counted yourself. Leave the row off when the building is only in its yearly maintenance cycle.

Form 2 is not the paper that proves last calendar year's maintenance. That proof is Form 3 under regulation 94(10) and MBS 002 section 6. Mixing the two names was understandable under older Development Regulations language. The current instruments use both forms, for different moments. The annual path is SA Form 3 annual proof.

PlanSA's form index is https://plan.sa.gov.au/resources/forms

FireCert Clock links that index. It does not host Form 2. A failure to comply with regulation 94(8) is one of the duties in regulation 94(14), which states a maximum penalty of $10,000 and an expiation fee of $750.

Upload the installation certificate and we fill it in for you

Upload the signed Form 2 and review the suggested completion date and the provision it covers. The steps are on upload a South Australian ESP form.

The schedule the certificate has to match is SA ESP schedule and records. The overview is South Australian essential safety provisions.

Presets are a guide. Confirm the installation paperwork with the council or building certifier who will receive it. FireCert Clock does not sign as the installer.

Form 2 is the installation certificate, not the yearly proof

MBS 002 section 5, May 2023, read 9 Nov 2026, says that in line with regulation 94(7) a compliance certificate for each installed essential safety provision on Form 1 is given to the council or building certifier, certifying installation to the approved standard and performance at that standard. The Chief Executive determined the form published as Form 2 on the SA planning portal. Where a certificate of occupancy is not required, or there is no licensed building work contractor, the standard says the owner endorses Form 2 and forwards it with the Statement of Compliance under regulation 104. https://plan.sa.gov.au/__data/assets/pdf_file/0006/1214187/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-3.pdf

The product notes regulation 94(8) as the case that requires the certificate within 20 business days after installation where no certificate of occupancy will be issued. That is an event deadline. No recurring anniversary is proposed. The annual proof to council is Form 3, described on annual proof.

PlanSA lists Form 2 as the certificate of compliance with essential safety provisions. https://plan.sa.gov.au/resources/forms

Installation file versus annual file

FeatureForm 2Form 3
MomentCompletion of installationEach calendar year of maintenance
Who signsInstaller. Owner endorses in the case MBS 002 section 5.5 describesOwner's annual verification
Clock20 business days in the regulation 94(8) case. Otherwise the completion path the standard describesNot later than 60 business days after the calendar year, unless exempt
BaselineInstallation standards and baseline data the standard says must be maintainedProof that performance still meets that baseline
TrackerOptional row. Turn it on for an installation you are watchingThe annual row you confirm yourself

How to track an installation without mixing the years

When a fitout finishes, store Form 2 against that provision and record the day it was provided. Do not copy that day forward 12 months and call it Form 3. Next January, open the annual proof note and count business days. Upload either form on upload an SA form and check which date field the suggestion landed in. The schedule those forms refer to is Form 1.

Can one contractor sign both?

Only if that person is the installer for Form 2 and is also the right person for the maintenance record behind Form 3. The forms are still two documents. MBS 002 does not merge them.

What if a certificate of occupancy will be issued?

Follow the path in section 5 that sends Form 2 to the council or certifier with the statement of compliance. The 20 business day case is the one the standard and regulation 94(8) describe for when no certificate of occupancy will be issued. Do not apply the 20 day count to a job that is on the occupancy path unless your certifier tells you that case applies.

FAQ

Who signs Form 2?

Regulation 94(7) says the installer, or the company manager responsible for the installation. MBS 002 adds endorsement steps for the occupancy path and the owner path. A name typed into a contact field is not that signature.

Does a new sprinkler head on an old building need Form 2?

Where the work is an installation of an essential safety provision listed on a schedule under regulation 94(4), regulation 94(5) requires a certificate of compliance for that provision. Ask the relevant authority if you are unsure the work is that kind of installation. No date is proposed in the meantime.

Can I use Form 2 as the yearly file to council?

No. Keep Form 2 with the installation record. Use Form 3 for the annual verification.