Form 1 Essential Safety Provisions Schedule, South Australia
The relevant authority issues the schedule. You keep the provisions, the maintenance records, and the 48 hour production duty in one place.
Regulation 94(4) of the Planning, Development and Infrastructure (General) Regulations 2017 says the relevant authority or council issues a schedule, in the form the Chief Executive publishes on the SA planning portal, that specifies the essential safety provisions for the building and the standards or other requirements for maintenance and testing set out in the relevant Ministerial building standard. The triggers in that subregulation include issuing a building consent where provisions are installed or required, assigning a change of classification where there is no building work, an owner application with the prescribed fee, and other certification that the building work complies with the Building Rules.
Ministerial Building Standard MBS 002 (May 2023) section 4 calls that schedule Form 1. Section 9 of the same standard is a schedule of options for completing Form 1, Form 2, and Form 3. Column 1 lists provisions that may be in a building. Column 3 lists maintenance and testing routines. For a particular building, only the provisions that are actually installed are listed on the issued form. Do not paste the whole options table onto a shop that has two provisions.
The regulations: https://www.legislation.sa.gov.au/__legislation/lz/c/r/planning%20development%20and%20infrastructure%20(general)%20regulations%202017/current/2017.24.auth.pdf
The standard: https://plan.sa.gov.au/__data/assets/pdf_file/0006/1214187/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-3.pdf
How to record it
The Form 1 row has no proposed due date. Issuing a schedule is the authority's act at consent or classification time, or when the owner applies. It is not an annual owner anniversary. Store the issue date if you have it, and upload the schedule or link to the copy you hold.
Each provision on that schedule is a line. Set the frequency to weekly, monthly, six monthly, or annual only when the issued Form 1 says so. If column 3 names a different routine, leave frequency unset and write the routine in the notes. MBS 002 section 3.3 says performance can be satisfied by the routines in column 3 of section 9. It does not authorise a software preset to pick a shorter or longer gap.
Mark the line when you hold the maintenance record for that provision. The flag is your note. It is not Form 3, and it is not a Form 12A.
Regulation 94(15) says the owner must, within 48 hours after an authorised officer asks, provide written proof that the maintenance and testing required by regulation 94(9) were carried out over a period the officer specifies, not exceeding the two preceding calendar years. The maximum penalty stated there is $2,500 and the expiation fee is $500. Keep the records where you can produce them. The product does not send them to the officer.
MBS 002 section 1.6 says the same production idea for a period not exceeding two years, within 48 hours of the request. Read both the regulation and the standard. Where they differ in wording, the regulation is the duty and the standard is the Ministerial building standard the regulation calls up.
Upload the issued schedule and we fill it in for you
Upload Form 1 and review the suggested provisions and the maintenance routines printed in its columns. The steps are on upload a South Australian ESP form.
The annual council proof that sits on top of these records is SA Form 3 annual proof. The installation certificate is SA Form 2 compliance certificate. The overview is South Australian essential safety provisions.
Presets are a guide. Confirm the schedule with the council or accredited professional who issued it. FireCert Clock does not issue Form 1.
Form 1 is the list, and it is not your annual deadline
MBS 002 section 4, May 2023, read 9 Nov 2026, says regulation 94(4) requires the relevant authority or council to issue a schedule of essential safety provisions when issuing a building consent for work that installs or changes them, when assigning a change of classification, when an owner applies for a new schedule, or when certifying Crown development that includes those provisions. The form is Form 1 on the planning portal. It lists the provisions and the maintenance and testing standards, including the installation standard that sets the baseline and the routine that keeps it. https://plan.sa.gov.au/__data/assets/pdf_file/0006/1214187/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-3.pdf
PlanSA's Form 1 page, read 9 Nov 2026, says the relevant authority uses it to designate the provisions, the installation standards, and the maintenance and testing. https://plan.sa.gov.au/resources/forms/Form_1_-_Schedule_of_ESPs_installed_or_to_be_installed
Owners of existing buildings may apply for a new Form 1 if they want to change routines, for example to AS 1851. That application is not the Form 3 proof.
How to turn the schedule into lines
| Feature | Column on the form, as MBS 002 section 7 describes the schedule options | What you store |
|---|---|---|
| Which provision | Only the provisions actually installed, not every row in section 9 of the standard | One line per provision on your Form 1 |
| Installation standard | Deemed to satisfy standard, or the performance solution baseline. Existing buildings may say "existing" if the baseline is identified | The standard name in the notes |
| Maintenance routine | The routine that keeps performance | The frequency you set on the line. No statewide frequency is proposed |
| Annual proof | Form 3, unless section 6.3 exempts the building | A confirmed date you counted. See annual proof |
Upload the schedule on upload an SA form. Installation certificates stay on Form 2. The overview is essential safety provisions.
Keep the records MBS 002 says the owner retains: routine maintenance records and condition reports. The standard says those records, plus the annual verification, are how ongoing performance is shown. The product holds the files you upload. It does not replace the record the council asks to see.
When does a new Form 1 arrive without building work?
The standard lists a change of classification, an owner application, and the Crown certification case, as well as consent for new work, alterations, and fire safety notice work. If you receive a new Form 1, replace the lines. Do not keep testing to a schedule that has been superseded.
Are the routines in section 9 mandatory for every building?
Section 7 says section 9 is a schedule of options, and that only the provisions actually installed are listed on the form. Use the routines the authority printed on your Form 1.
FAQ
Can the owner ask for a new schedule?
Regulation 94(4)(c) includes an application by the owner and payment of the prescribed fee. The product can store the new schedule after it is issued. It does not apply for one.
What if the old schedule says "existing" in the standards column?
MBS 002 section 7.3 allows "existing" in column 2 for a new schedule of an existing building where the baseline data is identified. Copy what the issued form says. Do not upgrade the baseline in a notes field and treat that as an approval.
Are smoke alarms in dwellings this schedule?
Regulation 95 is a separate smoke alarm duty for Class 1 and 2 dwellings, including a rule on transfer of title. It is not Form 1. Do not bury a regulation 95 alarm in an ESP line and assume the Form 3 exemption covers it.