Fire door inspection log
A fire door with a wedge under it is not a passing door. Log the opening, the closer and the label, then set the next walk.
Doors get wedged during move-in week. Closers get disconnected when tenants complain about noise. Labels get painted over during remodels. The annual visual is how you catch that, if someone wrote it down and filed the sheet. A paper log in the stairwell cannot email the facilities director when an opening failed three months ago and nobody ordered hardware. Create an asset per opening, or per floor if you walk them as a set, then attach the inspection sheet after each walk. FireCert Clock holds the schedule and the file. It does not certify doors and it is not an AHJ.
What to record on the visit
Door number and location so the next walk matches the last.
Closer operation and whether the latch seats without binding.
Glazing and hardware intact, with no field modifications that void the label.
Label readable and matched to the frame and door assembly.
No wedge or hold-open unless code allows a listed release device you also inspected.
Attach the sheet or PDF. Log a visit only when the work passes, since logging moves the next due date.
Interval choices
Follow the edition and the AHJ you actually have. A yearly formal inspection is common in many US programs. Some sites add a quarterly staff walk for high-traffic corridors. UK and other jurisdictions use different standards. Save what you do on the asset interval. This product does not set the code.
When intervals differ between wings, use separate assets rather than one vague "doors" row.
Reminders and contacts
Notices go out 30, 14, 7, 3 and 1 day before the due date, plus visibility on the overdue list once a walk is late. Email goes to you on every plan. Add the building manager or door contractor as a client contact on Starter so they receive the same mail.
Free covers 1 site and 25 assets at $0 a month. Starter is $39 a month for client emails and AI date reading when you upload formal inspection reports. Pro adds branded site PDFs for owner meetings. See pricing for higher site limits.
Proof for insurers and tenants
Property insurers and corporate safety teams increasingly ask for door inspection history with other life safety records. The combined site PDF lists each asset, dates and attachments so you are not merging folders the night before renewal.
Import a door list
CSV import accepts site, asset type, location and last service date. Useful when the last consultant left a spreadsheet of rated openings. Set the interval and technician when you add each asset; room-number fixes need a new asset row.
Intervals you choose for openings
A formal walk stored as 365 days uses the same day count as several annual presets on an account, including NFPA 10 maintenance, NFPA 25 annual tasks, NFPA 72 alarm testing, and the NFPA 101 90 minute discharge. That shared count is not a claim that those standards govern doors. Door intervals follow the edition and the AHJ you actually have. If you type 91 days for a staff walk on a second asset, you are reusing the quarterly day count as a choice you made, not as a door rule. UK and other jurisdictions differ. Save the interval you run.
What the sheet records
Door number, floor, closer operation, whether the latch seats, glazing and hardware condition, whether the label is readable and matches the frame, and whether a wedge or an unapproved hold-open was present. If a listed release is allowed, record that you inspected it. Attach the sheet or a photo. A failed closer stays unlogged until the opening passes, because logging moves the next due date. Do not mark a whole floor passed when one leaf failed.
Who initials the walk
The person who walked the openings initials the sheet. When a third-party firm performs the formal inspection, their signed report is the file you upload. FireCert Clock does not certify the assembly. The building manager can be a client contact on Starter so the same dates arrive without a screenshot.
What goes wrong between formal walks
Move-in week leaves a wedge under a leaf. A tenant unhooks a closer because of noise. A remodel paints the label. A magnetic hold-open tied to the alarm never gets a note because the alarm asset looked current. Busy hospitals and schools block leaves more often than a quiet office floor. A staff-walk asset catches the wedge without shifting the formal inspection date.
Worked due date for door D-214
Stair B, door D-214, formal inspection stored as 365 days. Last passing walk 22 January 2026. Next due 22 January 2027. Notices fall on 23 December 2026, 8 January, 15 January, 19 January and 21 January 2027, the 30, 14, 7, 3 and 1 day marks before 22 January. From 22 January 2026 to 22 January 2027 the count does not include 29 February, so the 365 day interval lands on the anniversary. A separate staff-walk asset at 91 days mails on its own ladder and does not move D-214.
FAQ
Should a failed door be a second asset?
Log a visit only when the opening passes inspection, since logging moves the next due date.
Can I attach a photo of the wedge?
Upload it on the visit with the sheet. Photos help the work order desk see what the walk found.
Can I group doors by floor?
Yes. One asset per floor works when you inspect every opening on that level in one pass.
Does FireCert Clock replace a third-party door inspection firm?
No. It tracks dates and stores paperwork. Your qualified inspector still performs the formal inspection when required.
What about smoke doors that are not fire rated?
Track them if your program requires it. Use a custom interval that matches your internal standard.
Can technicians see only door assets?
Assign door assets to that technician for an iCal feed focused on upcoming walks.
Hardware upgrades and replacements
When a failed closer becomes a full frame replacement, upload the new label photo on the same asset so history stays in one place.
Construction phasing
Temporary barricades often block rated openings during remodel. Upload the sheet or photo on the visit so the next walk knows which doors should be back in service.
Education and healthcare traffic
Hospitals and schools see more blocked fire doors than office towers. Quarterly staff walks on a second asset can catch problems between annual formal inspections without mixing two intervals on one row.
Coordination with IT and access control
Magnetic hold-opens tied to access control need documented testing when the fire alarm integrates with doors. Upload the sheet or photo on the visit when your program requires integration checks, even if the formal door inspection is annual.
Opening sign-off questions
Who initials a door sheet?
The person who walked that opening. A third-party formal report, when you use one, is the signed file you upload.
What does a failed closer record include?
Door number, the defect, a photo if you have one, and no visit log until the leaf passes. Logging would move the next due date.
Can a staff walk share D-214's date?
Only if you want one reminder. A second asset keeps the wedge check off the formal anniversary.